| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC ALL DOCUMENTRY CONDITION ARE FULLFILLED | |
| 2 | L2₹9.3 L+₹27,472.84 (3.03%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. | |
| 3 | Rejected-Technical | - | Rejected-Technical ALL DOCUMENTRY CONDITION ARE NOT FULLFILLED |
| Sl No | Description | Qty | Unit | SUNSHINE ASSOCIATES L1 | m/s sharam singh contractors L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complete. | 143.93 | cum | 122 ₹17,559.46 Lowest | 125 ₹17,991.25 |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 16.04 | cum | 5,450 ₹87,418 Lowest | 5,500 ₹88,220 |
| 3.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 65.86 | cum | 5,110 ₹3,36,544.6 | 5,100 ₹3,35,886 Lowest |
| 4.00 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 16.64 | sqm | 470 ₹7,820.8 Lowest | 480 ₹7,987.2 |
| 5.00 | Providing and Laying R.C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 10.24 | cum | 6,750 ₹69,120 Lowest | 6,800 ₹69,632 |
| 6.00 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 2.46 | cum | 7,700 ₹18,942 | 7,600 ₹18,696 Lowest |
| 7.00 | Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T & P, all lifts and leads etc. | 1.81 | cum | 5,200 ₹9,412 Lowest | 5,300 ₹9,593 |
| 8.00 | Providing and fixing Centering & shuttering for R.C.C. (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 21.01 | sqm | 780 ₹16,387.8 Lowest | 800 ₹16,808 |
| 9.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position,Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 1.14 | MT | 64,800 ₹73,936.8 | 63,500 ₹72,453.5 Lowest |
| 10.00 | Providing and fixing of 100 mm dia PVC pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge. | 2 | R.M. | 125 ₹250 Lowest | 150 ₹300 |
Tender Value
₹9.7 L
EMD Value
₹19,320
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCION DIVISION-9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 1.360 OF THARESA MINOR.
2026_UPIDC_1138628_1
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
THARESA JAYSINGH SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹19,320
Yes
SAMBHAL
27 Jul 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complete. | - | cum | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | cum | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | - | cum | - | - |
| 4 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | - | sqm | - | - |
| 5 | Providing and Laying R.C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | cum | - | - |
| 6 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | cum | - | - |
| 7 | Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T & P, all lifts and leads etc. | - | cum | - | - |
| 8 | Providing and fixing Centering & shuttering for R.C.C. (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | - | sqm | - | - |
| 9 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position,Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | - | MT | - | - |
| 10 | Providing and fixing of 100 mm dia PVC pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge. | - | R.M. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.59 MB
BOQ_2125886.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .