Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹96.5 L+₹2.9 L (3.06%)Rejected-AOC NO 888 TVS TOLLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | L2 | Rejected-AOC Rejected |
Tender Value
₹93.7 L
EMD Value
₹95,000
Closing Date
28 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Collectorate DRDA Perambalur
Strengthening and 5 years Maintenance of the Road from Sathanur to Kottarai Road KM 0/0-2/400 under MGSMT 25 percent 2022-2023 and 2023-2024 in Alathur Block of Perambalur District Package No.TN11-04
2023_RDTN_329775_1
DIPR/2876/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA Perambalur
As per Tender Document
3 documents required · 3 mandatory
₹0
₹95,000
8 Aug 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
Amount
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking BT scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3m and lead upto 1000m as per Technical Specification Clause 301.4
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10 metre and lift of 2 metre including all labour charges and incidental charges such as shoring, strutting, providing coffer dams,bailing out of water (As per earth work calculation sheet) KM 0/000 - 2/335
Providing and laying Gritty Gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to department gauge for premeasurements etc complete as per standard specifications and as directed as per standard specifications and as directed by the departmental officers KM 0/000 - 1/000.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete KM 0/000 - 2/335
Providing and laying PRIME COAT using slow setting emulsion bitumen Grade I at the rate of 7kg/10sqm over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 2/335
Providing and laying TACK COAT over WMM surface (treated with primer) using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., KM 0/000 - 2/335
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 2/335
Provision for HM Stone charges etc complete
Provision for KM Stone charges etc complete
Provision for Name Board Cum Citizen Board
Provision for 60cm Equilateral Triangle Sign Board
Road Marking with Hot Applied thermoplastic compound with reflectorising Glass beeds on bituminous surface providing and laying of hot applied thermoplastic compound 2.5mm thick including reflecctorising Glass beeds at 250gms per sqm area ,thickness of 2.50mm is exclusive of surface applied glass beeds as per IRC 35 . The finished surface to level uniform and free from streeks and holes extra complete as per MORTH specification no 803.KM 0/0-2/335
Construction of 1.50M RCC slab Culvert @ Ch 2/330m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
Above Sill level
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
Filling the gravel including cost and conveyance of materials to worksote etc complete.
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
Provision for Tar pad etc., complete.,
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PCV Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .