Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹29.9 L+₹3,286.98 (0.11%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹29.9 L+₹9,263.30 (0.31%)Rejected-AOC | L3 | Rejected-AOC Reject |
Tender Value
₹29.9 L
EMD Value
₹3.0 L
Closing Date
27 Apr 2026, 5:00 pmClosed
Executive Officer
Npp Sherkot
Construction of Teen Shade Tromal Plant Naya Gaon length 30Mt
2026_DOLBU_1131266_21
15VITT/RAJVITT/SWM/E-T-2025-26
Open Tender
Civil Works
Item Rate
75 days
Npp Sherkot
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Officer
₹3.0 L
Npp Sherkot
6 Jun 2026
6 Apr 2026
28 Apr 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation by manual means in ordinary soil ( Loam, clay or sand) including lift up to 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 M from the foundation trenches | 46.08 | Cum | - | - |
| 1.02 | Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 3.46 | Cum | - | - |
| 1.03 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work SOR item no 289 | 16.07 | Cum | - | - |
| 1.04 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 15.77 | Qtl | - | - |
| 1.05 | Applying Oil Bond distempering/ snowcem with primer coatincluding supply of all material ,labour and T&P etc.required for proper completion of work | 134.4 | SQM | - | - |
| 1.06 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. DSR 10.16.1 | 10,553.53 | KG | - | - |
| 1.07 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 648 | SQM | - | - |
| 1.09 | Painting Steel work with Deluxe Multi Surface Paint to give an
even shade. Two or more coat applied @ 0.90 ltr/10 sqm over
an under coat of primer applied @ 0.80 ltr/10 sqm of approved
brand and manufacture (DSR item No. 13.48.3) | 297.48 | SQM | - | - |
| 1.11 | Add GST | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
RAJVITT.pdf
Tender Documents • 2.40 MB
BOQ_2116335.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .