Loading…
Loading…
Tender Value
₹2.1 L
EMD Value
₹4,500
Closing Date
6 Jun 2026, 4:00 pmDue today
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Constcrution of RCC Drain near I/9 at I Type in Ward no. 22 Under AMC
2026_UDD_114601_17
UDD/AMC/09/2025-26 2ND_CALL
Open Tender
Civil Works
60 days
Ward No. 22
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹4,500
Yes
29 May 2026
29 May 2026
8 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain concrete or lime work including stacking serviceable materials in countable stacks within 15M.Lead and disposal of unserviceable materials within materials with all leads all complete as per direction of E/I [bcd 5.10.2] | 0.8 | Per M3 | 956.3 | ₹765.04 |
| 2 | Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (I). For classification of soil item-A (3.3.1) | 25.94 | Per M3 | 239.74 | ₹6,218.86 |
| 3 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.(5.1.10) | 2.16 | Per M3 | 589.51 | ₹1,273.34 |
| 4 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete. buiniding specifiacation and as per direction of E/I.(5.6.3) | 28.82 | Per M2 | 330.34 | ₹9,520.4 |
| 5 | Providing RCC M-20 with nominal mix (1:1.5:3) in foundation & plinth with approved quality of stone …do..do…direction of E/I | 10.09 | Per M3 | 5,218 | ₹52,649.62 |
| 6 | Providing reinforcement for casting of RCC ..do…do….[5.5.5(a)] | - | - | - | - |
| 7 | 8mm @ 0.395kg/m | 140.96 | Per Kg. | 83.31 | ₹11,743.38 |
| 8 | 10mm @0.617kg/m | 310.51 | Per Kg. | 82.1 | ₹25,492.87 |
| 9 | 12mm @0.890kg/m | 105.87 | Per Kg. | 80.88 | ₹8,562.77 |
| 10 | Providing suttering for casting wall and slab…do…do… E/I.[5.3.17.1] | 100.19 | Per M2 | 372.72 | ₹37,342.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
terms_conditions.pdf
Tender Documents • 0.57 MB
BOQ_154924.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid