Tender Value
₹25.1 L
EMD Value
₹50,000
Closing Date
31 Jul 2026, 5:00 pmClosed
Karnataka Building and Other Construction Workers Welfare Board
SUNIL KUMAR B
Shifting of EIP Feeders F7, F8, F9, F15-16, F-14, F17 and F18-19 due to Construction of Shramik Residential school opposite of the 110/33-11 kV Katakol Station in Katakol Village in Katakol Section of Ramadurga Sub-division, Belagavi District
KBOCWWB/2026-27/EL/WORK_INDENT55
KBOCWWB/2026-27/EL/WORK_INDENT55
Open
Electrical
Two Tender Document System(Two Cover)
KBOCWWB CEO and Secretary Office Bengaluru
₹630
₹50,000
4 Sept 2026
15 Jul 2026
3 Aug 2026
22 Jul 2026
22 Jul 2026
Shifting of EIP Feeders F7, F8, F9, F15-16, F-14, F17 and F18-19 due to Construction of Shramik Residential school opposite of the 110/33-11 kV Katakol Station in Katakol Village in Katakol Section of Ramadurga Sub-division, Belagavi District
Supply of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991
Erection of Poles Erection of 11mtr long Concrete spun pole in a pit of2.5 mtr depth. - Ordinary Soil
Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing - Ordinary Soil
Supply of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers For PSCC Pole 200 KG WL- MS
Erection of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers For PSCC Pole 200 KG WL- MS
Supply of 11kV Pin Insulator - Polymeric
Supply of 11kV 45 kN Polymeric insulator
Supply of Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07
Fixing of Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07
Digging of Pit for GUY SET - Ordinary Soil
Supply of Rabbit ACSR Conductor.
Stringing of Rabbit ACSR Conductor.
Supply of RCC Pole - 9 Mtr Long, 145 Kg WL
Erection of RCC Pole - 9 Mtr Long, 145 Kg WL
Supply of Spiral Earth Electrode
Erection of Spiral Earth Electrode
Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing - Hard Rock.
Digging of Pit for GUY SET -Hard Rock
Erection of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers For PSCC Pole 200 KG WL- MS
Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing.Hard Rock (By Chizling and/Or Wedging)
Dismantling of work-PSCC Pole - 9 Mtr Long, 200 Kg WL
Dismantling of work-Rabbit ACSR Conductor.
Dismantling of work-RCC Pole - 9 Mtr Long, 145 Kg WL
Supply of PSCC Pole - 9 Mtr Long, 200 Kg WL
Erection of PSCC Pole - 9 Mtr Long, 200 Kg WL
Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing.Hard Rock (By Chizling and/Or Wedging)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-2 SHIFTING OF ELECTRICAL POLES BD.pdf
Tender Document • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .