| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.9 LAccepted-Finance | ₹9.9 L | 1 | Accepted-Finance Lowest Amount Quoted |
| 2 | 2₹10.6 LAccepted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹10.6 L | 2 | Accepted-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | KATHIRAVAN R L2 | Saritha V L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening of the Road from TT Road To Kalanivasal. Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 423.75 | sqm | 25 ₹10,593.75 | 23 ₹9,746.25 |
| 2.00 | Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers | 20.34 | cum | 900 ₹18,306 | 876 ₹17,817.84 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 127.18 | cum | 2,555 ₹3.2 L | 2,509 ₹3.2 L |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,271.75 | sqm | 90 ₹1.1 L | 84 ₹1.1 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,271.75 | sqm | 22 ₹27,978.50 | 19 ₹24,163.25 |
| 6.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 31.8 | cum | 12,500 ₹4.0 L | 11,279 ₹3.6 L |
| 7.00 | Provision for Name board | 1 | Nos | 4,000 ₹4,000 | 3,000 ₹3,000 |
| 57.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,61,601 ₹1.6 L | 1,51,078 ₹1.5 L |
Tender Value
₹9.9 L
EMD Value
₹10,050
Closing Date
21 Nov 2025, 4:00 pmClosed
BDO VP Veppur
Block Development Officer Veppur
Strengthening of the Road from TT Road to Kalanivasal under namma ooru namma arasu village general fund 2025 2026
2025_RDTN_625255_1
Rc.No.3254/2025/A4 03.11.2025
Open Tender
Civil Works - Roads
180 days
Block Development office Veppur
As per Tender Documents
2 documents required · 2 mandatory
₹0
₹10,050
Yes
30 Dec 2025
21 Nov 2025
21 Nov 2025
21 Nov 2025
21 Nov 2025
21 Nov 2025
Amount
Strengthening of the Road from TT Road To Kalanivasal. Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KATHIRAVAN R (BID ID -1517571)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.37 MB
Tender Documents
Tender Documents • 0.25 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid