Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-not of respective panchayat |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-not from respective panchayat |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-not of respective panchayat |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-not from respective |
Tender Value
₹2.1 L
Closing Date
4 Jan 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RURAL ENGINEERING WING SHOP
EXECUTIVE ENGINEER RURAL ENGINEERING WING SHOPIAN
Construction of lane from house Of Isaq Tak to Masjid shrief Ashanpora at kachdoora A ) P/H kachdoora Block Kaprin
2021_RDPR_155438_3
NIT 205 OF 2021-22
Open Tender
Civil Works
Item Rate
SHOPIAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹250
Rural Development and Panchayati Raj
Exempted
5 Jan 2022
30 Dec 2021
5 Jan 2022
30 Dec 2021
4 Jan 2022
30 Dec 2021
30 days
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m inwidth as well as 10 sqm on plan including disposal of excavated earth lead up to 50 m and lift up to 1.5 m and directed by engineer in charge all kinde of soil
Providing and laying stone solling dry handpacked tightly i Including carriage from source to site of work complate
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttring all work up tp to plinth level with miix1:2 :4 ( 1 cement :2 course sand :4 graded stone aggregate) nominal size 20 mm crushed crushed stone aggregate including carriage complate up to site of work
Centering and shuttering including strutting and propping including removal of farm work in fondations slabs,beams raft etc incld carriage
carriage of cement from nearest source to site of work
provision for fixing carriage and cost of sign board
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .