Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.1 LAccepted-AOC | ₹41.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹41.2 LRejected-Finance | ₹41.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹44.2 LRejected-Finance UKLANA MANDI HARYANA | ₹44.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹44.5 LRejected-Finance 174 GANDHI NAGAR GURUDWARA ROAD NARWANA 126116 | NARWANA | JIND | HARYANA | 126116 | ₹44.5 L | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical 302 VILLAGE KARSINDHU 126115 | KARSINDHU | REWARI | HARYANA | 126115 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | the uklana mandi co op l and c society L3 | THE DAROLI KHERA L AND SOCIETY LTD L1 | THE NARWANA GROVER CO-OP L&C SOCIETY LTD L4 | The Shri Ganesh Cooperative Labour and Construction Society Ltd. Uchana L2 |
|---|---|---|---|---|---|---|---|
| 1.00NS items | |||||||
| 1.01 | S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions. | 4 | Each | 300 ₹1,200 | 1,500 ₹6,000 | 2,500 ₹10,000 | 200 ₹800 Lowest |
| 1.02 | S/E of Split A.C. 2.0 Ton 5 star (Lloyed/ Voltas/ Blue Star/Diakin) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 68,000 ₹68,000 | 48,000 ₹48,000 | 60,000 ₹60,000 | 25,000 ₹25,000 Lowest |
| 1.03 | S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 50 | sqft | 40 ₹2,000 | 100 ₹5,000 | 50 ₹2,500 | 20 ₹1,000 Lowest |
| 1.04 | S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 30 | sqft | 250 ₹7,500 | 100 ₹3,000 Lowest | 100 ₹3,000 Lowest | 100 ₹3,000 Lowest |
| 1.05 | S/E of 20 watt LED tube light fitting (Philips/Bajaj/Crompton/Wipro/Havells/Surya) make including all patty material required to complete the job in all respect. | 20 | Each | 400 ₹8,000 | 150 ₹3,000 | 300 ₹6,000 | 100 ₹2,000 Lowest |
| 1.06 | S/E of split A.C. 1.5 Ton 5 star (Lloyed/Voltas/Blue Star/Diakin) make including making necessary connections and all patty material required to complete the job in all respect. | 1 | Each | 55,000 ₹55,000 | 35,000 ₹35,000 | 50,000 ₹50,000 | 20,000 ₹20,000 Lowest |
Tender Value
₹46.3 L
EMD Value
₹1.3 L
Closing Date
24 Sept 2025, 1:00 pmClosed
SANDEEP CHITRA
XEN Zila Parishad Hisar
CONSTRUCTION OF SUB HEALTH CENTRE AT VILLAGE HASSANGARH BLOCK - BARWALA , DISTRICT - HISAR
2025_HRY_473178_1
202551FBC438 3579 419D BB84 ADFB107E2CB92172DEV
Open Tender
Civil Works
Works
120 days
HASSANGARH
2 documents required · 2 mandatory
₹5,000
₹1.3 L
Yes
28 Oct 2025
18 Sept 2025
24 Sept 2025
18 Sept 2025
24 Sept 2025
18 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].