| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Low level quoted rate |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance High level quoted rate |
| Sl No | Description | Qty | Unit | PRABHU L2 | M/S MUNISHWARAN TRADERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation | 89.28 | Cum | 300 ₹26,784 | 263 ₹23,480.64 |
| 2.00 | Filling of sand including all cost and conveyance and labour charges etc.copmplete. | 8.64 | Cum | 2,000 ₹17,280 | 1,666 ₹14,394.24 |
| 3.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 11.52 | Cum | 5,500 ₹63,360 | 5,267 ₹60,675.84 |
| 4.00 | Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc complete | 230.4 | Sqm | 550 ₹1.3 L | 547 ₹1.3 L |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. charges | 26.5 | Cum | 6,100 ₹1.6 L | 6,024 ₹1.6 L |
| 6.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges | 57.6 | Sqm | 600 ₹34,560 | 585 ₹33,696 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 77,463.72 ₹77,463.72 | 75,224.07 ₹75,224.07 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
24 Dec 2025, 3:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Construction of Drainage in Paleshwaram Panchayat under PMAGY 2025-26
2025_RDTN_634974_1
R.C.No.DRDA/179/2025/A14 Dt.28.11.2025
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
5 Feb 2026
22 Dec 2025
24 Dec 2025
22 Dec 2025
24 Dec 2025
22 Dec 2025
Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation
Filling of sand including all cost and conveyance and labour charges etc.copmplete.
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. charges
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Schedule.pdf
Tender Documents • 0.38 MB
BOQ_759817.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid