| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | +0.00% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹2,677.45 (1.00%)Admitted-Finance | +1.00% | ₹2.7 L+₹2,677.45 (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 L+₹8,915.92 (3.33%)Admitted-Finance 1 262 BAISHNABGHATA PATULI TOWNSHIP M BLOCK M 262 B P TOWNSHIP MAIL SATHBIGHA PURBA PUTIARY KOLKATA 700093 | 24 PARAGANAS SOUTH | WEST BENGAL | 700093 | +3.33% | ₹2.8 L+₹8,915.92 (3.33%) | L3 | Admitted-Finance |
Tender Value
₹2.7 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 12:00 pmClosed
DG (CIVIL)
5 S N BANERJEE ROAD KOLKATA-700013
PATCHWORK BY PROVIDING HOT MIX AT DIFFERENT PLACES IN FRONT OF PUJA PANDELS AND SURROUNDING AREA UNDER WARD NO.113
2026_KMC_1039961_1
XI/113/013/2026-27/R
Open Tender
CIVIL WORKS
Percentage
60 days
WARD NO-113
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
15 Sept 2026
1 Sept 2026
10 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 40.84 | CUBIC METER | 79.9 | ₹3,263.18 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 13.61 | CUBIC METER | 990.4 | ₹13,482.9 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 181.51 | SQUARE METER | 361 | ₹65,526.73 |
| 4 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 181.51 | SQUARE METER | 188.23 | ₹34,166.47 |
| 5 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, | 3 | EACH | 1,507.28 | ₹4,521.84 |
| 6 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, | 5 | EACH | 1,758.9 | ₹8,794.5 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 181.51 | SQUARE METER | 11.07 | ₹2,009.37 |
| 8 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 1,669.59 | SQUARE METER | 10.18 | ₹16,996.38 |
| 9 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time | 1,851.1 | SQUARE METER | 41 | ₹75,895.1 |
| 10 | Sub Total | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2553901.xls
BOQ • 0.29 MB
FORM013.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .