| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹6.3 L Quoted ₹5.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹6.0 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹6.0 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DEVI FABRICATORS AND ENGINEERING CONTRACTORS L1 | SS ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for loading, unloading of 1 Set of FRP fan blades (Cooling Tower ID fans of stage-II) from MTPS-I central stores to outside workshop for reconditioning works and return back the same from outside workshop to MTPS-I central stores after completion of reconditioning works. (2 sets = 16 Nos) | 2 | set | 3,120 ₹6,240 | 3,220 ₹6,440 |
| 2.00 | Charges for cleaning of blades with wire brush and acid washing. grinding and removing of existing resin, putty and chopped strand mat over the arm and blade surface of entire blade. | 16 | Nos. | 11,420 ₹1.8 L | 11,770 ₹1.9 L |
| 3.00 | Charges for smooth leveling by grinding and sander machine, applying putty on the arm and blade surface, smooth leveling by emery sheet. After that the chopped strand mat to be wounded on the blade and arm surface area mixed with Isobathic resin, catalyst, Accelerator & pigment as recondition work. [Cost of Isobathic resin, catalyst, accelerator and pigment are on contractor scope] | 16 | Nos. | 11,420 ₹1.8 L | 11,770 ₹1.9 L |
| 4.00 | Charges for applying two coats of Isobathic resin for smooth finishing over the entire surface of blade, weighing of blade should be maintained 65 Kgs+/- 0.5 and marking the weight. [Cost of Isobathic resin on contractor scope] | 16 | Nos. | 6,600 ₹1.1 L | 6,800 ₹1.1 L |
| 5.00 | Charges for painting with two coats of epoxy grey Paint over the surface of the FRP blades. | 78 | m² | 106 ₹8,268 | 112 ₹8,736 |
| 6.00 | Cost of Putty for Sl.No.3 | 32 | Kgs | 106 ₹3,392 | 112 ₹3,584 |
| 7.00 | Cost of Chopped strand mat for Sl.No.3 | 128 | Kgs | 150 ₹19,200 | 160 ₹20,480 |
| 8.00 | Cost of FRP compound [Isobathic Resin] for Sl.No.3&4 | 160 | Kgs | 235 ₹37,600 | 250 ₹40,000 |
| 9.00 | Cost of Accelerator for Sl.No.3&4 | 20 | Lit | 450 ₹9,000 | 510 ₹10,200 |
| 10.00 | Cost of Catalyst for Sl.No.3&4 | 20 | Lit | 235 ₹4,700 | 250 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
24 Sept 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Unit III and IV Reconditioning of released FRP fan blades 2 Sets for Cooling Tower ID fans of stage II
2025_EB_602532_1
CE/MTPS-I/SE/M-I/CA/OT. 256 /2025-26
Open Tender
Power/Energy Projects/Products
60 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,800
Yes
15 May 2026
10 Sept 2025
25 Sept 2025
10 Sept 2025
24 Sept 2025
10 Sept 2025
Amount
Charges for loading, unloading of 1 Set of FRP fan blades (Cooling Tower ID fans of stage-II) from MTPS-I central stores to outside workshop for reconditioning works and return back the same from outside workshop to MTPS-I central stores after completion of reconditioning works. (2 sets = 16 Nos)
Charges for cleaning of blades with wire brush and acid washing. grinding and removing of existing resin, putty and chopped strand mat over the arm and blade surface of entire blade.
Charges for smooth leveling by grinding and sander machine, applying putty on the arm and blade surface, smooth leveling by emery sheet. After that the chopped strand mat to be wounded on the blade and arm surface area mixed with Isobathic resin, catalyst, Accelerator & pigment as recondition work. [Cost of Isobathic resin, catalyst, accelerator and pigment are on contractor scope]
Charges for applying two coats of Isobathic resin for smooth finishing over the entire surface of blade, weighing of blade should be maintained 65 Kgs+/- 0.5 and marking the weight. [Cost of Isobathic resin on contractor scope]
Charges for painting with two coats of epoxy grey Paint over the surface of the FRP blades.
Cost of Putty for Sl.No.3
Cost of Chopped strand mat for Sl.No.3
Cost of FRP compound [Isobathic Resin] for Sl.No.3&4
Cost of Accelerator for Sl.No.3&4
Cost of Catalyst for Sl.No.3&4
Cost of Pigment for Sl.No.3&4
coat of Epoxy grey paint for SL.No.5
Cost of Epoxy Thinner for SL.No.5
Hire charges for Transporting (Vehicle charges)
Consumables & T & P's charges for S.No.1 to 5
SS ENGINEERING CONTRACTOR (BID ID -1469679)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_720275.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid