Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹3.2 L
Closing Date
5 Sept 2026, 6:00 pm
Sh. J. Boruah, AGM(E-C)
1st Floor New RHQ Building, AAI Guwahati-15
Construction of DVOR Building at Rupsi Airport. SH Civil and Internal Electrification Work Balance Works
2026_AAI_287750_1
AAI/Engg-Civil/e-NIT/RUPSI /DVOR/26-27
Open Tender
Civil Works
Item Rate
Rupsi Aiprort
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹3.2 L
15 Aug 2026
15 Aug 2026
7 Sept 2026
15 Aug 2026
5 Sept 2026
15 Aug 2026
15 Aug 2026 - 24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 9,420 | sqm | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 710 | cum | - | - |
| - | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil
Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 500 | metre | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 170 | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 12 | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 196 | cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | 48 | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for :
Columns, Pillars, Piers, Abutments, Posts and Struts | 177 | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for :
Suspended floors, roofs, landings, balconies and access platform | 112 | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 107 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.41 MB
TENDERDVOR.pdf
Tender Documents • 3.39 MB
BOQ_335722.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].