Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹6.8 L+₹27,434.30 (4.18%)Rejected-Finance | L2 | Rejected-Finance Highest | |
| 3 | L3₹6.9 L+₹38,664.05 (5.89%)Rejected-Finance | L3 | Rejected-Finance Highest | |
| 4 | L4₹7.0 L+₹43,487.50 (6.63%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L4 | Rejected-Finance Highest | |
| 5 | L5₹7.0 L+₹48,115.50 (7.33%)Rejected-Finance MADAN LAL UDAY SINGH JAIN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L5 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L4 | M/S AMIT TRADERS L5 | M/S J. D. Enterprises L3 | KALAYANI CONSTRUTION L6 | BALAJI TRADERS L1 | SHANTI ENTERPRISES L8 | ARYA SHAKTI ASSOCIATES L2 | M/S INDRAWATI CONSTRATION L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 172.66 | cum | 50 ₹8,633 Lowest | 65 ₹11,222.9 | 65 ₹11,222.9 | 60 ₹10,359.6 | 60 ₹10,359.6 | 50 ₹8,633 Lowest | 65 ₹11,222.9 | 100 ₹17,266 |
| 2.00 | Earth work in Back filling including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 153 | cum | 100 ₹15,300 | 160 ₹24,480 | 120 ₹18,360 | 145 ₹22,185 | 90 ₹13,770 | 75 ₹11,475 Lowest | 140 ₹21,420 | 100 ₹15,300 |
| 3.00 | Laying P.C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 12.23 | cum | 8,200 ₹1,00,286 | 6,500 ₹79,495 Lowest | 8,700 ₹1,06,401 | 8,950 ₹1,09,458.5 | 7,900 ₹96,617 | 9,000 ₹1,10,070 | 7,700 ₹94,171 | 8,000 ₹97,840 |
| 4.00 | Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work. | 73.8 | sqm | 160 ₹11,808 | 160 ₹11,808 | 161 ₹11,881.8 | 158 ₹11,660.4 | 100 ₹7,380 Lowest | 150 ₹11,070 | 190 ₹14,022 | 625 ₹46,125 |
| 5.00 | Laying C.C. work in 1:2:4 (M15) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 7.56 | cum | 9,000 ₹68,040 | 8,700 ₹65,772 | 8,700 ₹65,772 | 8,900 ₹67,284 | 8,900 ₹67,284 | 9,000 ₹68,040 | 8,600 ₹65,016 | 8,000 ₹60,480 Lowest |
| 6.00 | 1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work | 22.29 | cum | 6,200 ₹1,38,198 | 6,800 ₹1,51,572 | 5,540 ₹1,23,486.6 | 5,495 ₹1,22,483.55 Lowest | 5,600 ₹1,24,824 | 6,500 ₹1,44,885 | 6,600 ₹1,47,114 | 6,000 ₹1,33,740 |
| 7.00 | 12 mm thick plaster with cement mortar inproportion of 1:4 cement and sand of 1.25 F.M. over brick work minium thickness not be less than 10 mm including supply of all materials,labour and T&P etc required for proper, completion of work. | 102.68 | sqm | 190 ₹19,509.2 | 195 ₹20,022.6 | 213 ₹21,870.84 | 210 ₹21,562.8 | 160 ₹16,428.8 | 150 ₹15,402 | 190 ₹19,509.2 | 40 ₹4,107.2 Lowest |
| 8.00 | Supply and fixing PVC pipe 100 mm for drainge spout ,labour, t&p etc. required for proper completion of work. | 24.23 | Rm. | 200 ₹4,846 | 150 ₹3,634.5 Lowest | 170 ₹4,119.1 | 175 ₹4,240.25 | 180 ₹4,361.4 | 150 ₹3,634.5 Lowest | 150 ₹3,634.5 Lowest | 300 ₹7,269 |
| 9.00 | Supply and fixing PVC pipe 150 mm for drainge spout ,labour, t&p etc. required for proper completion of work. | 29.07 | Rm. | 400 ₹11,628 | 330 ₹9,593.1 | 380 ₹11,046.6 | 375 ₹10,901.25 | 390 ₹11,337.3 | 300 ₹8,721 Lowest | 340 ₹9,883.8 | 300 ₹8,721 Lowest |
| 10.00 | E/W in excavation for foundation fixing boundry piller including lead up to 30 M. And lift up to 1.50 M including back filling, proper disposal and dressing as per profile for complete work | 27.29 | cum | 50 ₹1,364.5 Lowest | 64 ₹1,746.56 | 65 ₹1,773.85 | 62 ₹1,691.98 | 70 ₹1,910.3 | 80 ₹2,183.2 | 70 ₹1,910.3 | 100 ₹2,729 |
Tender Value
₹9.4 L
EMD Value
₹19,000
Closing Date
5 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Saryu Nahar Khand-1 Gorakhpur
Executive Engineer Saryu Nahar Khand-1 Gorakhpur
Project for Reconstruction of Damaged Outlets(Kulaba) of Bharoh Minor under the Gola pump Canal System
2026_UPIDC_1187024_13
02/EE/26-27
Open Tender
Civil Works - Canal
Item Wise
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹19,000
17 Nov 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 172.66 | cum | 100 | ₹17,266 |
| 2 | Earth work in Back filling including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 153 | cum | 100 | ₹15,300 |
| 3 | Laying P.C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 12.23 | cum | 100 | ₹1,223 |
| 4 | Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work. | 73.8 | sqm | 100 | ₹7,380 |
| 5 | Laying C.C. work in 1:2:4 (M15) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 7.56 | cum | 100 | ₹756 |
| 6 | 1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work | 22.29 | cum | 100 | ₹2,229 |
| 7 | 12 mm thick plaster with cement mortar inproportion of 1:4 cement and sand of 1.25 F.M. over brick work minium thickness not be less than 10 mm including supply of all materials,labour and T&P etc required for proper, completion of work. | 102.68 | sqm | 100 | ₹10,268 |
| 8 | Supply and fixing PVC pipe 100 mm for drainge spout ,labour, t&p etc. required for proper completion of work. | 24.23 | Rm. | 100 | ₹2,423 |
| 9 | Supply and fixing PVC pipe 150 mm for drainge spout ,labour, t&p etc. required for proper completion of work. | 29.07 | Rm. | 100 | ₹2,907 |
| 10 | E/W in excavation for foundation fixing boundry piller including lead up to 30 M. And lift up to 1.50 M including back filling, proper disposal and dressing as per profile for complete work | 27.29 | cum | 100 | ₹2,729 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_2237937.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .