Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.8 LAccepted-AOC 232 PATEL CHOWK PHUSRO BAZAR BOKARO 829104 | BOKARO | JHARKHAND | 829104 | ₹1.8 L | l1 | Accepted-AOC l1 |
| 2 | l2₹2.0 LRejected-Finance OLD KARO BERMO DIST BOKARO | BERMO | BOKARO | ₹2.0 L | l2 | Rejected-Finance l2 |
| 3 | l3₹2.0 LRejected-Finance NEAR UCO BANK PHUSRO BAZAR BERMO JHARKHAND 829144 | BOKARO | JHARKHAND | 829144 | ₹2.0 L | l3 | Rejected-Finance l3 |
| Sl No | Description | Qty | Unit | SANJAY KUMAR TIWARI L1 | M.L. Enterprises L3 | M/s Jitendra Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling of 8" dia M/S Pipeline (17 nos. x 6.15 m = 104.55 m) | 104.55 | metre | 135 ₹14,114.25 | 150 ₹15,682.50 | 150 ₹15,682.50 |
| 1.02 | Laying of 8" dia G.I. Pipeline (19 nos. x 6.15 m = 116.85 m) | 116.85 | metre | 180 ₹21,033 | 200 ₹23,370 | 200 ₹23,370 |
| 1.03 | Loading and unloading including transporting of 8" dia G.I. Pipeline | 19 | no. | 335 ₹6,365 | 350 ₹6,650 | 350 ₹6,650 |
| 1.04 | Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27") | 1,026 | inch | 12 ₹12,312 | 12.5 ₹12,825 | 13 ₹13,338 |
| 1.05 | Double layer welding of 8" dia M.S./ G.I. Pipes | 2,052 | inch | 14.5 ₹29,754 | 17.5 ₹35,910 | 16 ₹32,832 |
| 1.06 | Supply of G.I. Flange 08" dia (H.D.) | 38 | no. | 1,050 ₹39,900 | 1,250 ₹47,500 | 1,250 ₹47,500 |
| 1.07 | Making and fixing of Rubber Joints | 56 | no. | 110 ₹6,160 | 125 ₹7,000 | 125 ₹7,000 |
| 1.08 | Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve/ Flowmeter | 3 | no. | 822.5 ₹2,467.50 | 850 ₹2,550 | 850 ₹2,550 |
| 1.09 | Providing and fixing of M.S. Nut & Bolts | 380 | set | 20 ₹7,600 | 25 ₹9,500 | 21 ₹7,980 |
| 1.10 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-in- charge. (All kinds of soil) | 320 | sqm | 127.5 ₹40,800 | 130 ₹41,600 | 130 ₹41,600 |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
27 Feb 2025, 11:00 amClosed
PE EnM Karo OCP
OFFICE OF PE EnM Karo OCP
Diversion and shifting of the Digital Flowmeter installed at the delivery pipeline of the 2000 GPM Pump by dismantling, cutting and laying of 8 inch dia M.S. Pipeline, in Mine w.r.t. Karo OCP, under BnK Area
2025_CCL_329302_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 102
Open Tender
Electrical and Maintenance Works
5 days
KARO OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,700
14 Mar 2026
17 Feb 2025
28 Feb 2025
17 Feb 2025
27 Feb 2025
17 Feb 2025
17 Feb 2025 - 27 Feb 2025
Amount
Dismantling of 8" dia M/S Pipeline (17 nos. x 6.15 m = 104.55 m)
Laying of 8" dia G.I. Pipeline (19 nos. x 6.15 m = 116.85 m)
Loading and unloading including transporting of 8" dia G.I. Pipeline
Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27")
Double layer welding of 8" dia M.S./ G.I. Pipes
Supply of G.I. Flange 08" dia (H.D.)
Making and fixing of Rubber Joints
Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve/ Flowmeter
Providing and fixing of M.S. Nut & Bolts
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-in- charge. (All kinds of soil)
Total impact of GST for the purpose of CTC
M/s Jitendra Enterprises (BID ID -1132336)
M.L. Enterprises (BID ID -1132330)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid