| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹39.0 L (10.8%)Admitted-Finance | ₹4.0 Cr+₹39.0 L (10.8%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹44.3 L (12.3%)Admitted-Finance | ₹4.0 Cr+₹44.3 L (12.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ms BHARAT ENTERPRISES L2 | M/S HIL VIEW TRADERS L1 | M/S R B ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00SH:- EARTH WORK | ||||||
| 1.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 13,026.94 | Cum | 236 ₹30,74,357.84 Lowest | 890 ₹1,15,93,976.6 | 940 ₹1,22,45,323.6 |
| 1.02 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all liftand lead upto 1000 metres ) | 5,462.46 | Cum | 373 ₹20,37,497.58 Lowest | 696.6 ₹38,05,149.64 | 1,200 ₹65,54,952 |
| 1.03SH :- CEMENT CONCRETE PAVEMENT | ||||||
| 1.04 | Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.) | 8,164.8 | Cum | 135 ₹11,02,248 | 89.09 ₹7,27,402.03 Lowest | 289.3 ₹23,62,076.64 |
| 1.05 | Granular Sub-base with Close Graded Material (Table:- 400-1)Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (i) for grading- I Material | 816.48 | Cum | 1,946 ₹15,88,870.08 | 945 ₹7,71,573.6 Lowest | 1,590.62 ₹12,98,709.42 |
| 1.06 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | 612.36 | Cum | 4,235 ₹25,93,344.6 | 430.1 ₹2,63,376.04 Lowest | 560 ₹3,42,921.6 |
| 1.07 | Rolled Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum, aggregate cement ratio15:1 and minimum cement content of 200 kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.) | 1,512 | Cum | 4,906 ₹74,17,872 | 35.3 ₹53,373.6 Lowest | 48.3 ₹73,029.6 |
| 1.08SH: CC DRAIN WITHOUT LID-1.80Km | ||||||
| 1.09 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 1,224 | Cum | 430 ₹5,26,320 | 405.1 ₹4,95,842.4 Lowest | 1,102.6 ₹13,49,582.4 |
Tender Value
₹5.5 Cr
EMD Value
₹5.5 L
Closing Date
27 Mar 2025, 4:00 pmClosed
EE Chayangtajo PWD
EE Chayangtajo PWD
C/o Gyawepurang CO Hq. Township Road (CMCSRDR-II)
2025_PWDAP_2337_1
CD/DRG-II/NIe-T/2024-25/02
Open Tender
Civil Works – Roads
Item Rate
24 days
Gyawepurang
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
EE PWD Chayangtajo
₹5.5 L
Yes
28 Mar 2025
17 Mar 2025
28 Mar 2025
17 Mar 2025
27 Mar 2025
17 Mar 2025
Amount
SH:- EARTH WORK
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all liftand lead upto 1000 metres )
SH :- CEMENT CONCRETE PAVEMENT
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
Granular Sub-base with Close Graded Material (Table:- 400-1)Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (i) for grading- I Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Rolled Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum, aggregate cement ratio15:1 and minimum cement content of 200 kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.)
SH: CC DRAIN WITHOUT LID-1.80Km
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
PCC Grade M20
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Centring and shutterimg including strutting proping etc. and removal of form work for:
(a) Founadtions and plinth
SH : RCC Slab culvert 1.50 mtr span.-5 nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (i) Ordinary soilA Manual Means (Depth upto 3 m)
(ii) Ordinary rock (not requiring blasting)A Manual Means (Depth upto 3 m)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (B) PCC Grade M20, Height upto 5m
RCC Grade M20, Using Concrete Mixer,For T-beam & slab, 25-35% of (a+b+c) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification (a) Square Rubble Coursed rubble masonry( first sort )
(b) Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (B) Sandy material
SH : Welcome Gate
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications(B) PCC Grade M20
RCC Work in Columns, Pillar
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) M 20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.a) Tar/ TMT Steel
12 mm cement plaster 1:4
Centring and shutterimg including strutting proping etc. and removal of form work for:
(a) Founadtions and plinth
b) Column, pillars, posts and struts etc.
d) Lintels, beams, girders, bressumers and cantilevers etc.
Welcome Gate decoration and beautification with traffic signs, markings, scriptings etc complete as per site as per direction of engineer-in-charge
Ms BHARAT ENTERPRISES (BID ID -6960)
M/S R B ENTERPRISE (BID ID -7015)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
NIet_CMSRDP_Gyawepurang.pdf
Tender Documents • 4.37 MB
BOQ_2501.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .