Loading…
Loading…
Tender Value
₹54.7 L
EMD Value
₹1.3 L
Closing Date
15 Sept 2026, 2:00 pm
SE Civil
57 George town
Civil Construction work for increasing capacity
2026_UPCTL_1178159_1
31/ECTC,PRG/2026-27
Open Tender
Civil Works
Percentage
90 days
Varanasi
Refer to tender documents and PQR
2 documents required · 2 mandatory
₹7,080
SE CTC PRG A/c 8832005900000016 IFSC PUNB0883200
₹1.3 L
19 Aug 2026
19 Aug 2026
16 Sept 2026
19 Aug 2026
15 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation(All kinds of soil.) trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (DSR 2.8.1) | 410 | Cum | 190 | ₹77,900 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(DSR 2.27) | 35 | Cum | 1,546 | ₹54,110 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(DSR 2.31) | 500 | Sqm | 13 | ₹6,500 |
| 4 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.(DSR 2.36) | 500 | Sqm | 68 | ₹34,000 |
| 5 | Providing and laying 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.2)) | 60 | Cum | 6,073 | ₹3,64,380 |
| 6 | Providing and laying 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.8)) | 45 | Cum | 4,960 | ₹2,23,200 |
| 7 | Providing and laying 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.10)) | 48 | Cum | 4,746 | ₹2,27,808 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns(DSR 4.3.1) | 140 | Sqm | 286 | ₹40,040 |
| 9 | Providing and laying 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level (DSR 5.1.2) | 36 | Cum | 6,586 | ₹2,37,096 |
| 10 | Reinforced cement concrete work1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement.(DSR 5.2.2) | 11 | Cum | 7,902 | ₹86,922 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.59 MB
BOQ_2213837.xls
BOQ • 0.34 MB
31DocsforIncreasingCapacityAtSadatGhazipurVNS.pdf
Tender Documents • 3.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].