Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | Accepted-Technical Tender accepted |
| 2 | Accepted-Technical | Accepted-Technical Tender accepted |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
5 Oct 2026, 2:00 pmClosed
SE/CEDC/North/CBE
O/o, The Superintending Engineer/CEDC/North, Tatabad,Coimbatore-12.
SE/CEDC/N/CBE/C/No.08/26-27
2026_EB_706170_1
SE/CEDC/N/CBE/C/No.08/2026-27
Open Tender
Civil Works
Works
90 days
MRT Office North
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,200
Yes
12 Oct 2026
19 Sept 2026
6 Oct 2026
19 Sept 2026
5 Oct 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing damaged brick wall and clearing away from the site including cost of labour charges, lead, lift, etc., complete. | 4 | m³ | - | - |
| 2 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, etc., complete but excluding cost of steel reinforcement. | 1.6 | m³ | - | - |
| 3 | Brick work in CM 1:5 using fly ash bricks, including cost of all materials, labour, curing, all leads and lifts etc., complete. | 5.9 | m³ | - | - |
| 4 | Plastering with CM 1:5, 12 mm thick including the cost of all material, labour charges, lead, lift etc. complete. | 65.5 | m² | - | - |
| 5 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. | 110 | kgs | - | - |
| 6 | White washing two coats using white cement including cost of all materials, labour, scafolding charges, all leads & lifts etc., complete, as per standard specification. | 65.5 | m² | - | - |
| 7 | Disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete. | 4 | m³ | - | - |
| 8 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | - | - |
| 9 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | - | - |
| 10 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | Lumpsum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_848749.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .