Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹38.5 L+₹1.0 L (2.78%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹42.7 L+₹5.2 L (13.9%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹53.0 L+₹15.5 L (41.4%)Rejected-Finance WZ 831 NANGAL RAYA PANKHA ROAD NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L4 | Rejected-Finance Other than lowest | |
| 5 | Rejected-Technical B 497 S F MEERA BAGH PASCHIM VIHAR NEW DELHI 110063 | WEST DELHI | DELHI | 110063 | - | Rejected-Technical No Requisite document not submitted |
Tender Value
₹46.5 L
EMD Value
₹92,900
Closing Date
25 Oct 2021, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINTENANCE OF ELECTRICAL PASSENGER LIFTS INSTALLED AT ARJAN VIHAR (BLOCK NO. 1 TO 10, 11A, 11B, 12A, 12B, 13A, 13B, 14 TO 17, 18A, 18B, 19A, 19B, 20A, 20B, 21, 23 TO 35 AND 37), 505 ABW (04 NOS), ENGR OFFICER MESS (02 NOS.) AND PLI (02
2021_MES_477973_1
GE(U)/PM/D-39/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
DELHI CANTT
MES contractor enlisted under class D category c(ii) having deposited standing security of Rs 100000 with department. Contractor not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
6 documents required · 6 mandatory
₹500
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
₹92,900
Yes
4 Dec 2021
27 Sept 2021
27 Oct 2021
27 Sept 2021
25 Oct 2021
11 Oct 2021
Amount
SECTION-I
Comprehensive maintenance of electrically operated 08 passenger lifts installed at PLI, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Schindler India Pvt Ltd. ) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Four floor i.e total Five landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) PLI:- (i) PLI Block/ Building = 02 Nos Lift Make of Lift:- M/s Schindler India Pvt Ltd. Capacity of Lifts:- 08 Passengers Total Qty = 02 x 11 months = 22
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M/s TKE India Pvt, Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ARJAN VIHAR:- (i) Block/ Building No. 19B, 20A, 20B, 21, 23, 28 & 31 = 07Nos Lift Make of Lift:- M/s Thyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 08 Passengers Total Qty = 07 x 11 months = 77
Comprehensive maintenance of electrically operated 1000Kg goods lifts installed at 505 ABW, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Indo Fuji Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Basement + Ground i.e total Two landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) 505 ABW:- (i) 505 ABW (NBC BUILDING)= 01 No. Lift Make of Lift:- M/s Indo Fuji Pvt Ltd. Capacity of Lifts:- 1000 Kg Goods Lift = 01 No. lift. Total Qty = 01 x 11 months = 11
Comprehensive maintenance of electrically operated 06 passenger lifts installed at Engineer Officers Mess, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Indo Fuji Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Four floor i.e total Five landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ENGINEER OFFICERS MESS:- (i) Block/ Building No. III = 01 No. Lift Make of Lift:- M/s Indo Fuji Pvt Ltd. Capacity of Lifts:- 06 Passengers = 01 No. lift. Total Qty = 01 x 11 months = 11
SECTION-II
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s OTIS Elevator Co. India Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ARJAN VIHAR:- (i) Block/ Building No. 1 to 10, 12A, 13A, 18A, 18B, 19A = 15 Nos Lift Make of Lift:- M/s OTIS Elevator Co. India Ltd. Capacity of Lifts:- 08 Passengers Total Qty = 15 x 9 months = 135
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Johnson Lifts Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ARJAN VIHAR:- (i) Block/ Building No. 11A, 11B, 12B, 13B, 14, 34 & 37 = 07 Nos Lift Make of Lift:- M/s Johnson Lifts Pvt Ltd. Capacity of Lifts:- 08 Passengers Total Qty = 07 x 9 months = 63
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Engr Officers Mees, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s OTIS Elevator Co. India Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Four floor i.e total Five landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ENGR OFFICERS MESS:- (i) Block/ Building No. II = 01 No Lift Make of Lift:- M/s OTIS Elevator Co. India Ltd.. Capacity of Lifts:- 08 Passengers Total Qty = 01 x 9 months = 9
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M/s TKE India Pvt, Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) ARJAN VIHAR:- (i) Block/ Building No. 15 to 17, 24 to 27, 29, 30, 32, 33 & 35 = 12 Nos Lift Make of Lift:- M/s Thyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 08 Passengers Total Qty = 12 x 9 months = 108
Comprehensive maintenance of electrically operated 15 passenger lifts installed at 505 ABW, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M /s TKE India Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Two floor i.e total Three landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) 505 ABW:- (i) 505 ABW = 01 No Lift Make of Lift:- M/s Thyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 15 Passengers = 01 No lift. Total Qty = 01 x 9 months = 09
Comprehensive maintenance of electrically operated 2000Kg goods lifts installed at 505 ABW, lift in reliable safe and efficient operating condition through MoU with respective OEM of existing lift (Original Equipment Manufacturer of lift M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M /s TKE India Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + First floor i.e total Two landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. (a) 505 ABW:- (i) 505 ABW = 02 Nos. Lift Make of Lift:- M/s Thyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 2000 Kg Goods Lifts = 02 Nos. lift. Total Qty = 02 x 09 months = 18
Notes for Section I & II (Item No. 2.00 to 5.00 & 7.00 to 12.00) :- (i) The comprehensive maintenance (Gold Agreement for M/s OTIS Elevator Co. India Ltd. and M/s Indo Fuji Pvt Ltd., Platinum Agreement for M/s Johnson Lifts Pvt Ltd., M/s Schindler India Pvt Ltd. and M/s TKE India Pvt Ltd.) shall be done through respective OEM of existing lifts i.e. of M/s OTIS Elevator Co. India Ltd./ M/s Indo Fuji Pvt Ltd./ M/s Johnson Lifts Pvt Ltd./ M/s Schindler India Pvt Ltd./ M/s TKE India Pvt Ltd. (ii) The contractor will have to submit MOU on each stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 100 to 102 from respective OEM of existing lifts i.e of M/s OTIS Elevator Co. India Ltd./ M/s Indo Fuji Pvt Ltd./ M/s Johnson Lifts Pvt Ltd./ M/s Schindler India Pvt Ltd./ M/s TKE India Pvt Ltd. within Twenty Eight days from date of Acceptance of tender. If the delay from OEM side to submit the MoU, the contractor to be submit evidence to the Accepting Officer and permission to be obtained from Accepting Officer for delay in submission of MoU. (iii) Contractor will conclude AMC with OEM and copy of the Agreement along with Tax Invoice will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as and when required for smooth and efficient functioning of the equipment/lift. (v) The contract included for repair, replacement of machines, motors, generators, door ropes, inverter/ ARD system, controller parts, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock break shoes, liners, contactors, relays, push bottons, coils, door operator VVF drive, VVVF main drive, car door, safety device limit switches, governor, hoistway door locks, indicators and minor mechanical spare parts. The cost of above materials are deemed to be included in the rates quoted by the contractor.
Notes for Section I & II (Item No. 2.00 to 5.00 & 7.00 to 12.00) contd.../ :- (vi) The materials like replacement of car cabin, ceiling frames, panels, fixtures, hoist way door panels, door frames, sills, car floorings, floor covering, light fittings, bulbs, tubes, main line power swtiches, breakers, feeders to controller, hoist way wiring, hydralic jack outer casing, burried piping, alignment of elevator guide rails, smoke and fire sensors, communication devices, security systems, landing doors, sheave rim, hoist rope, ARD battery and cabin fans are not included in the quoted rate. (vii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (viii) Contractor will prominently display his contact/ mobile number and OEM contact number inside and outside the lift on each lift for call in emergency. (ix) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge. (x) Contractor to be submit Safety Security Certificate of lifts from OEM in every month as per performa mentioned in Particular Specification here-in-after and also contractor to submit serviceability of lights and fans in lifts and machine room in every month in writing. (xi) The OEM will also detail one technician staff to inspect the lift every week regarding functioning of lifts or any other issues arising in the lift. The problem noticed if any to be informed immediately to JE E/M / Engr-in-Charge. Incase no technician detailed Rs. 500/- per week per lift will be deducted from conctractors dues. Technician should alaways carry service tools during site visit in every week. (xii) Monthly maintenance check will be carried out by OEM as per monthly maintenance check list mentioned in Particular Specification here-in-after.
Choice india
M/s Dhapola Elevator and Engineering
Tushar engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .