Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance BENARAS ROAD CHOWDHURY PARA KONA HOWRAH 711114 | HOWRAH | HOWRAH | WEST BENGAL | 711114 | L1 | Accepted-Finance LOWEST | |
| 2 | L2₹24.9 L+₹25,151.70 (1.02%)Rejected-Finance MAITANA BATTALA PURBA MEDINIPUR | MEDINIPUR EAST | WEST BENGAL | 721130 | L2 | Rejected-Finance Greater than L1 | |
| 3 | L3₹25.0 L+₹32,313.12 (1.31%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | L3 | Rejected-Finance Greater than L1 |
Tender Value
₹24.8 L
EMD Value
₹49,502
Closing Date
9 Dec 2024, 2:00 pmClosed
EE, NMD ,PHE Dte
OFFICE OF THE EXECUTIVE ENGINEER ,NORTHERN MECHANICAL DIVISION ,PHE Dte.SILIGURI SUKANTA SARANI, PARESH NAGAR, SILIGURI, PIN 734001
Desilting of Intake well by bailing out water slurry (sand, silt, gravels etc.) at Fulbari Intake Pumping Station of Siliguri Comprehensive Water Supply Scheme, under Northern Mechanical Division., PHE Dte.
2024_PHED_769685_3
WBPHED/EE/NMD/NIeT- 17 OF 2024-2025
Open Tender
MECHANICAL
Item Rate
180 days
Siliguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹49,502
Yes
20 Jan 2025
18 Nov 2024
12 Dec 2024
19 Nov 2024
9 Dec 2024
19 Nov 2024
Amount
Mobilization and transportation of plant & Mechinery tool & tackles to work site including loading & un-loding of material for to & fro journey.( Three times)
To provide approach facility of compressor and desilting pump with engine by earth filling as per instruction of E.I.C.( Three times)
Erection of derrick if necessary and installation of winch & crab to facilatate lowering & withdrawing of water jetter and pumps including necessary scaffolding inside the wall. ( Three times)
Fabrication of wooden platform inside the intake well at 1st compartment and 2nd compartment on temporary basis as per requirement for execution of desilting work. ( Three times)
Installation of Diesel operated Pump set to bail out water slurry and all other equipment including fitting, fixing to its proper position. ( Three times)
Bailing out water slurry ( Ad-mixture of sand, silt, gravels, pebbles, mud & foreign materials etc.) from the intake well by engaging skilled labour to complete the job as per direction of E.I.C. ( including cost of fuel & lubricants to be supplied by Agency.) ( Three times)
Hiring charges of Diesel Generating set and other requirments including Jetter, Rotary Pump, Air Compressor, Floater, Flexible Ladder, House Pipe, Tools & Tackles & other relevant machinery & accessories as would be required to complete the job. ( Three times)
Operation of Air Compressor, water Jetter, Vibrator etc. & other equipments as would be necessary to bail out water & slurry.( Three times)
Dismantling & removing plant & machinery after cleaning the Intake well work site complete including pack up charges for transportation for shifting.( Three times)
The entire work should be completed within the period from 01.01.2025 to 30.06.2025.
Add:- GST @18%
MENAKA ENTERPRISE (BID ID -5802068)
CONCORD ENGINEERING (BID ID -5802087)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .