Tender Value
₹5.3 Cr
EMD Value
₹10.7 L
Closing Date
18 Sept 2026, 12:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
CE/CON/II
15 conditions · 3 needing a document upload
Submit the scanned copy (In PDF Form) of the documents as per the requirement of financial eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
The Bidder must have completed the work of Land Acquisition from beginning to the mutation of land for Railway or Highway Project through above or any other contract within the last 3 years irrespective of the amount of work. Otherwise the bid will be summarily rejected.
26 conditions · 15 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Notes for all schedules: Standard Schedule of Rates (SSOR) Items: Any item of work carried out by the Contractor on the instructions of the Engineer which is not included in the accepted Bill(s) of Quantities but figures in the Standard Schedule of Rates (SSOR), shall be executed at the rates set forth in the "Standard Schedule of Rates (SSOR)" modified by the tender percentage as accepted in the contract for that chapter of Standard Schedule of Rates (SSOR). However, the cumulative value of all such extra item(s) together (modified by the respective tender percentage) shall not exceed 10 % of the original contract value.
Option of Payment through Letter of Credit (L.C.): Tenderer(s) may submit option for taking payment through Letter of Credit (L.C.). [Refer para 7.1 of tender document].
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India for the relevant date. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date.
Electronic Reverse Auction (eRA) is applicable in works tender valued more than Rs 50 crore in each case. [Refer para 7.2 of tender document].
Contract under EBR (IF): It is agreed by and between the parties that Railway shall continue to be held responsible for all obligations, risk and liabilities, whatsoever, arising out of or in connection with the Principal agreement and this novation agreement, whether during the progress of the work or after its completion. It is further agreed and understood by and between the parties that IRFC shall be the owner of assets, if any, arising out of execution of works as defined in the Principal Agreement, except the land whose ownership shall continue with Railway. Accordingly, the invoices shall be issued by capturing GSTIN of contractor (as the supplier) and GSTIN of IRFC (as bill to party). Also, the contractor shall submit the invoice, issued in the name of IRFC, to railway for processing payment by Railway to contractor subject to applicable TDS under the Income Tax, GST or any other applicable laws. It is further agreed by and between the Parties that IRFC shall be responsible to comply with Income Tax and GST laws in relation to filling of returns.
There are several changes in the tender document after the new GCC April 2022 is issued. Tenderer(s) are requested to go through the tender document & GCC carefully before the submission of the offer.
Clarification of Bids: To assist in the examination, evaluation & comparison and pre-qualification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
All General Instructions are available in the uploaded tender document.
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids). Nominated official is Dy CE/Con/Adra, Office of the Dy CE/Con/Adra, S. E. Railway.
Facilitation to comptent Authority for land acquisition (CALA) to the Railway Project In connection with BURN-CNI 4th line, CNI-GDBR ROR, ADRA -SANKA- RUKNI doubling, RUKNI-ANARA ROR, PRR- GTD ROR, ADRA-JOC Project under the jurisdiction of Dy. CE/CON/Adra. (Chargeable estimate No. 2035 W/2025, 2009 W/2025 , 2012W/2025 , 2026W/2025.)
03-SERC-ADA-CE-C-II-3-26~SER
03-SERC-ADA-CE-C-II-3-26
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹10.7 L
26 Aug 2026
26 Aug 2026
4 Sept 2026
18 items across 1 schedule · ₹5,34,94,536.33 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Assisting Competent Authority for Land Acquisition (CALA) for land acquisition, preparation of details from available land records for publishing Prelimary notification after notification, publicity of the same to all the owners by distribution of notices, affixing the notice on the notice board of every village office, Panchayat /Talathi's office for information and seeking objections under relevant section of land Acts, taking photographs as proof of fixing acknowledgement from Project Affected Person/Peoples (PAPs)etc. complete with consultant 'sown man power, stationary/Xerox /consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Village. | Each | 250.00 2413.85 | — | 6,03,462.5 |
| 2 | Facilitating CALA for carrying out actual Ground Survey of land with Revenue Staff & landowners/sub- holders, with consultant's Survey equipment's, manpower etc. items includes demarcation of land boundary with wooden pegs, lime powder, preparation and issue of notices to all concerned such as landowners, Agriculture/ Forest/PWD departments, preparation of drawing, area calculation, abstract statement (Vivaran-Patra) in five sets, collection of ROR abstract etc. Giving assistance to Agriculture/Forest/ PWD for their measurement works by providing skilled manpower complete in all respects, with all Consultant's own stationary/printing, consumables, including transport arrangement etc. complete in all respect. | Kilometre | 166.00 38064.63 | — | 63,18,728.58 |
| 3 | Facilitating CALA for preparation of Declaration of notification statement in prescribed format Hindi & English in 2 copies for publication in Gaz. Notification collection of documents required such as ROR abstract etc. Complete with all consultant's own man power, stationary/Xerox/ consumables, including transportation etc. Complete in all respect for all balance villages separately district wise for complete job verification by S.E. Railway and correction by Consultant. | Job | 250.00 38064.63 | — | 95,16,157.5 |
| 4 | After Declaration notification, publicity of the same to all the owners by distribution of notice, affixing the notice on the noticeboard of every village office, Panchayat/Talathi's office for information and seeking Claims under Determination of Award, taking photographs as proof of fixing etc. complete with consultant's own man power, stationary/Xerox/ consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Village | Each | 250.00 2413.85 | — | 6,03,462.5 |
| 5 | Facilitating Public Works Department for survey and valuation of affected structures, and any other value addition to the land etc. complete in all respect, with consultant's own man power, stationary/printing/consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Per Village | Each | 25.00 6777.35 | — | 1,69,433.75 |
| 6 | Facilitating Forest department for valuation of affected trees etc. complete in all respect, with consultant's own man power, stationary /printing/consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village | Each | 250.00 2228.18 | — | 5,57,045 |
| 7 | Facilitating Agriculture department for valuation of affected trees etc. complete in all respect, with consultant's own man power, stationary/printing /consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village | Each | 250.00 2228.18 | — | 5,57,045 |
| 8 | Facilitating Competent Authority for collecting all documents required for preparation of award such as ROR abstract, Record of Land abstract, widow certificate, below poverty line(BPL) list, etc. with consultant's own machinery, man power, stationary/printing/consumables, including transportation etc. complete in all respect. Note: Here unit Each means Per Village. | Each | 250.00 9785.39 | — | 24,46,347.5 |
| 9 | Facilitating Competent Authority for preparation of order for transferring the land with all documents required such as Site Survey sheet, Vivaran- Patra, possession receipt, etc. Submission to respective Tahsil with consultant's own machinery, man power, consumables, transportation etc. complete. Note: Here unit Each means Per Village. | Each | 250.00 482.77 | — | 1,20,692.5 |
| 10 | Facilitating CALA for preparation of Land Looser Certificate/Lesser Assesment Register, chasing the matter and further submission to Tahsildar, Circle officer (Mandal Adhikari)/ Talathi for transferring land title with consultant's own machinery, man power, consumables, transportation etc. Complete. Note: Here unit Numbers means No. of plots. | Numbers | 7000.00 250.67 | — | 17,54,690 |
| 11 | Facilitating Tahsildar, Circle officer (Mandal Adhikari)/ Talathi for transferring land title, chasing the matter with consultant's own machinery, man power, consumables ,transportation etc. complete. Note: Here unit Numbers means No. of plots. | Numbers | 7000.00 250.67 | — | 17,54,690 |
| 12 | Taking photographs of structures with name board of each Project Affected Person/Peoples (PAPs)and submission of hard copy with all details of PAP such as name, survey no. structure details etc. with consultant 'sown machinery, man power, consumables, transportation etc. complete. This should be submitted village wise in 2copies one with ring binding and other loose. Note: Here unit Each means Per structure. | Each | 6600.00 157.84 | — | 10,41,744 |
| 13 | Facilitating CALA/S.E. Railway for taking physical possession of land by verifying the acquisition area as per possession receipt with the land owner and submit the joint report in prescribed format having signature of all members in ROR abstract of land owner, with all consultant' sown machinery, man power, consumables, transportation etc. Complete. Note: Here unit Numbers means Survey No | Numbers | 7000.00 835.57 | — | 58,48,990 |
| 14 | Facilitation CALA/S.E. Railway for verification of survey as per the complaint of land owner with Revenue Staff & landowners/sub-holders, with Consultant's survey equipments, manpower etc. items includes preparation and issue of notices to all concerned such as landowners, Agriculture/Forest/PWD, area calculation, preparation of drawing, abstract statement(Vivaran-Patra) in five sets. CoUection of ROR abstract etc. Complete in all respect, with all Consultant's own stationary/ printing/consumables including transportation etc. complete. Note: Here unit Each means Per Village. | Each | 250.00 14668.80 | — | 36,67,200 |
| 15 | Carrying out ground survey with total station at location/ village where previously carried by plane table, with Consultant's survey equipment, man power etc. items includes, area calculation, preparation of drawing, etc. complete in all respect, with all consultant's own stationary /printing/consumables, including transportation etc. complete. Note: Here unit Each means Per Village | Each | 250.00 13183.35 | — | 32,95,837.5 |
| 16 | Photography /Videography, numbering of agriculture (fruit bearing) & forest trees within the Railway boundary and beyond Railway boundary up to proposed ROW as per joint measurement sheet by making notch of size 100x100mm, painting white paint on it and numbering the trees in each survey number with red enamel paint. Taking photographs and video shooting of the trees of each survey numbers of the village coming under acquisition in private land and Railway land separately. Preparation of document as per preforma enclosed and submission of same in soft & one set of hardcopy. The item includes all contractor's material, labours, transportation tools & plants ,etc. . For private land, number oftrees should be identified as per Survey no./Land owner wise and within existing railway land, the number of trees should be identified as per Railway Km/EP. | Each | 8000.00 83.57 | — | 6,68,560 |
| 17 | For panchnama due to noncompletion of joint measurement due to mass opposition in a village or stretch with Revenue Staff & landowners/sub- holders, incl. survey equipments, man power, etc. including transport arrangement etc. complete in all respect with all contractor labour, materials tools & plants | Kilometre | 100.00 2729.50 | — | 2,72,950 |
| 18 | Providing hoisting & fixing in position M 20 grade precast RCC boundary stone as per the drawing for demarcation of Land boundary by excavating, refilling and ramming and concreting by1:3:6 concrete with Consultant's material tools and plants and labour crossing of track and including transportation at site etc. complete in all respect. | Each | 10000.00 1429.75 | — | 1,42,97,500 |
| Schedule total | ₹5,34,94,536.33 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril-2022.pdf
ATTACHMENT
TD03-2026.pdf
ATTACHMENT
AdvanceCorrectionSlipNo1to11.pdf ACS 1 to 11
ATTACHMENT
AdvanceCorrectionSlipNo1to11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].