Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 85 PANNADI KATTUVALAVU THOTTILPATTY SALEM CAMP METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 3 147 KPN NAGAR MELTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.1 L
EMD Value
₹23,200
Closing Date
8 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP II Breakdown work preventive maintenance Assistance for carrying out cold vulcanizing
2022_EB_220668_1
CE SE M II MTPS I CHP II OT 188 2021 2022
Open Tender
Miscellaneous Works
Works
120 days
MTPS-I
As per Tender Specification
5 documents required · 5 mandatory
₹0
₹23,200
Yes
9 Feb 2022
24 Jan 2022
9 Feb 2022
24 Jan 2022
8 Feb 2022
24 Jan 2022
180 days
Amount
Charges for unloading counterweight from counterweight box arranging chain block and belt clamps, lifting counterweight box to the required level and after completion of belt joint work, releasing the counterweight box, loading the counterweight in Conveyors 8A2, 8B2, 9A, 9B, 10A, 10B, 11A, 11B, 12A1, 12B1, 12A2, 12B2, 14, 15A, 15B, 16, & 18 in CHP-II division
Charges for unloading of counterweights from counterweight box (40 Ton), arranging chain block, belt clamps, lifting counterweight box to the required level and after completion of pulley replacement work/belt joint work, releasing the counterweight box, loading the counterweight pieces in the box in conveyors 13 & 17.
Charges for loosening the belt tensioning device and making platform to carry out cold vulcanizing joint and assembling the same & removing the platform after completion of joint work in Intermediate & boom conveyor of SCR Machine I & II.
Charges for assisting for carrying out one number cold vulcanizing joint in 1400 mm width conveyor belt which includes clamping the belt, removing of idlers from the idler stand, idler frame of above 15 Nos., cutting and removal of worn out/damaged joint and excess elongated belt, pulling by using steel wire rope, positioning the belt, arranging platform and after completion of cold vulcanizing, releasing belt clamp, fixing idlers to the idler frame and assisting for trial run of the Conveyors 8A2, 8B2, 9A, 9B, 10A, 10B, 11A, 11B, 12A1, 12B1, 12A2, 12B2, 13, 14, 15A , 15B, 16, 17 & 18 and Intermediate conveyor & boom conveyor of SCR Machine-I & SCR Machine-II
Charges for transporting and positioning of new 1400 mm conveyor belt drum near junction towers/location arranging pulleys, cutting & removal of worn out damaged belt from 1400mm width conveyor, releasing the belt from drum including lead lift, laying and tensioning the conveyor belt etc. rolling the released worn out/damaged belt, devolution of retrieved belt scrap to central stores/MTPS-I
Replacement of 1800 mm width conveyor belt work in belt feeders (a) Charges for stretching the belt from 1800 mm width belt roll for cutting the belt to required length 10 mtrs to 25mtrs transporting the belt to the work spot (Board vehicle and crane will be provided at free of cost), cutting and removing the worn out belt from the location for devolution purpose, removal of skirt Board and hoods covers complete, after removal of supports, leading the belt to the BFD placing the new belt putting holes at one end for fixing special clamps for stretching over the belt feeders 7A1, 7A2, 7B1, 7B2, 8A, 8B, 9A, 9B, 13A2, 10A, 10B, 11A, 11B, 12A & 12B
Charges for laying new belt on Belt Feeder, Clamping the belt. Assistance for making 1 No. cold vulcanizing joint. After completion of work releasing belt clamps fixing idler, idler frames, skirt board, pulley hood, vertical supports etc., adjusting the belt tension and trial run of the Belt Feeder
Charges for complete loosening the belt feeder tensioning device for loosen the belt and lifting the non-drive pulley by using chain pulley block and wire rope along the two piece pillow block dismantling of tensioning device for attending repair work at work spot or replacement of new belt tensioning device in position erection of pulley along with two piece pillow block positioning and tightening on all Belt feeders 7A1, 7A2, 7B1, 7B2, 8A, 8B, 9A, 9B, 13A2, 10A, 10B, 11A, 11B, 12A & 12B of CHP-II Division
Charges for positioning the belt ends, arranging platform and clamps, assistance for making 1 no. cold vulcanizing belt joint in 1400 mm width conveyor belt on ground floor in CHP-II division
Cost of cutting gas – 1/10 Sets for Sl.No.3
T&P’s and consumables for Sl.No. 1 to 8
K.DHANASEKARAN ENGG. CONTRACTOR
stage.html
html • 0.02 MB
finance_260915.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .