Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED AS L1 BIDDER | |
| 2 | L2₹17.9 L+₹21,710 (1.23%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED AS L2 BIDDER | |
| 3 | Rejected-Technical NAI BASTI GALI NO 3 STATION ROAD POLICE CHOWKI PARICHHA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | - | Rejected-Technical NOT SUVMIT THE REQUIRED DOCUMENT |
Tender Value
₹18.3 L
EMD Value
₹37,000
Closing Date
5 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
Office of Superintending Engineer OMC-IV, 2X250 MW, PTPP, Parichha, Jhansi
Routine and Breakdown Maintenance of lighting/illumination systems of main plant, service building and BOP area, 400/220 kv switchyard, 2x250MWchimney and switching on/off of lighting fixtures and panels and up keeping of power cables control cables
2022_RVUNL_746578_1
W-PAR/C/OMC4/EMD2/6000000665
Open Tender
Electrical Works
Fixed-rate
365 days
PTPP, PARICHHA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
Dy. Chief Account Officer, CFA and BO, PTPP
₹37,000
22 Dec 2022
9 Nov 2022
6 Dec 2022
9 Nov 2022
5 Dec 2022
9 Nov 2022
9 Nov 2022 - 5 Dec 2022
Amount
Routine and Breakdown Maintenance of lighting/illumination systems of main plant, service building and BOP area chimney/HPSV Lights/ACDB/DCDB/ELDV/LDV Fixtures welding receticles and lighting/Emergency T/F installed in 400/220kv switchyard gantry/LM area and 400KV MCB Building of EMD-I Divi and switching on/off of lighting fixtures and panels and up keeping of power cables control cables and associated cables trays, 2x250MW,CTPS,PTPP,Parichha,Jhansi as per scope of work Part-A.1.
Routine maintenance and up keeping of power cables, control cables and associated cable trays as per scope of work Part-A.2 from Sl. No. 1 to 9.
Salvaging/laying of 1CX800/3CX185 HT UE XLPE Cable
Salvaging/laying of 1CX800 /3CX185/3CX300 LT Cable
Salvaging/laying of 1CX630/3CX150/3CX185 LT Cable
Salvaging/laying of 1CX400/3CX120/1CX300 LT Cable
Salvaging/laying of 2CX120/3CX95/3C70/1CX185 LT Cable
Salvaging/laying of 1CX150/1CX120/3CX50 LT Cable
Salvaging/layingCABLE SIZE BELOW 35 MM2 (1CX35,3CX35, 3.5CX35)
Salvaging/layingCABLE SIZE BETWEEN 35 MM2 TO 50 MM2(1CX50, 3CX50,3.5CX50)
end termination of 1CX800/3CX185 HT UE XLPE Cable
end termination of 1CX800 /3CX185/3CX300 LT Cable
end termination of 1CX630/3CX150/3CX185 LT Cable
end termination of 1CX400/3CX120/1CX300 LT Cable
end termination of 2CX120/3CX95/3C70/1CX185 LT Cable
end termination of 1CX150/1CX120/3CX50 LT Cable
end terminationCABLE SIZE BELOW 35 MM2 (1CX35,3CX35, 3.5CX35)
end terminationCABLE SIZE BETWEEN 35 MM2 TO 50 MM2(1CX50, 3CX50,3.5CX50)
Straight through jointing of 1CX800/3CX185 HT UE XLPE Cable
Straight through jointing of 1CX800 /3CX185/3CX300 LT Cable
Straight through jointing of 1CX630/3CX150/3CX185 LT Cable
Straight through jointing of 1CX400/3CX120/1CX300 LT Cable
Straight through jointing of 2CX120/3CX95/3C70/1CX185 LT Cable
Straight through jointing of 1CX150/1CX120/3CX50 LT Cable
Straight through jointingCABLE SIZE BELOW 35 MM2 (1CX35,3CX35, 3.5CX35)
Straight through jointingCABLE SIZE BETWEEN 35 MM2 TO 50 MM2(1CX50, 3CX50,3.5CX50)
Relugging only of 1CX800/3CX185 HT UE XLPE Cable
Relugging only of 1CX800 /3CX185/3CX300 LT Cable
Relugging only of 1CX630/3CX150/3CX185 LT Cable
Relugging only of 1CX400/3CX120/1CX300 LT Cable
Relugging only of 2CX120/3CX95/3C70/1CX185 LT Cable
Relugging only of 1CX150/1CX120/3CX50 LT Cable
Relugging onlyCABLE SIZE BELOW 35 MM2 (1CX35,3CX35, 3.5CX35)
Relugging onlyCABLE SIZE BETWEEN 35 MM2 TO 50 MM2(1CX50, 3CX50,3.5CX50)
Laying of cables of all sizes power cables covered in Part-A above including end termination.
Laying of all type of control cables etc. including end termination. (as per scope of work)
Fabrication and fixing of cable racks & other M.S. structures. (as per scope of work)
Laying of cable trays of different type alongwith Accessories. (as per scope of work) width upto 300 mm.
Laying of cable trays of different type alongwith Accessories. (as per scope of work) width more than 300 mm.
Erection of various type of TPN switch/starter upto 63 A rating. (as per scope of work)
Erection of various type of TPN switch/starter above 63 A rating. (as per scope of work)
Cleaning of cable tray by removal of tray cover during O/H or S/D for attending cable fault or removal of accumulated coal dust and cleaning of tray and reffixing. (as per scope of work)
Providing new tray cover at different location and clamping thereof as per size.(as per scope of work)
Digging of earth for locating and attending the faulty portion Of cable and refilling in the same manner after attending the fault. (as per scope of work)
Providing cable markers as danger board at every 10 metre to Avoid damage to under ground cable by grouting 2 Ft. long angle Pieces wherever required. (as per scope of work)
Removal & refixing of chequer plate or grid or fire proof board for attending cable fault on beneath the racks or for maintenance purpose. (as per scope of work)
Removal of cable from Trench/Tunnel & cartage/storage at site store by proper re-rolling.Power cables less than 50 sqmm.
Removal of cable from Trench/Tunnel & cartage/storage at site store by proper re-rolling. Control cables of all types. (as per scope of work)
Writing of nomenclature in the size of 1-1/2 inch as and when required anywhere on the panel board. (as per scope of work)
Proper filling of holes/gaps in cable gallery area with Plastic of Paris (POP) to avoid air/dust ingress in this area.
Painting of trays/plates or other M.S. structures with red oxide primer with material. (as per scope of work)
Painting of trays/plates or other M.S. structures with synthetic enamel of reputed brands. Asian paints/Berger /Nerolac with material. (as per scope of work)
Checking & Cleaning of cables in open cable tray during O/H or S/D for locating/attending cable fault or removal of accumulated coal dust and cleaning of tray and reffixing. (as per scope of work)
Cleaning of cable galleries of 140Mx9.0M size floors at zero meter & ten meter elevation and out side area of DG sets building and Weekly cleaning of cable gallery roofs of 140Mx9.0M and all four side walls with doors of cable galleries at zero meter & ten meter elevation as per scope of work Part-C(I)-1( a to e) and C(I)-2( a to c).
“Routine cleaning of floors and collection and proper disposal of garbage of .4KV LT panels of main plant and BOP areas of unit # 5&6 , 2x250 MW And Cleaning of roofs , walls and windows of 0.4KV LT panels of main plant and BOP areas of unit # 5&6 , 2x250 MW. All the spider nets etc. shall be disposed off.” As per scope of work Part C(II) Sr. No. 1 to 7.
M/S R.P. CONSTRUCTION CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .