| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.2 Cr+₹4.2 L (3.63%)Rejected-AOC B 108A SECTOR 36 GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹1.2 Cr+₹4.2 L (3.63%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹1.2 Cr+₹7.4 L (6.42%)Rejected-AOC 201 MAJNAWAN FAIZABAD SADAR FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | ₹1.2 Cr+₹7.4 L (6.42%) | L-3 | Rejected-AOC L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
22 Sept 2020, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER RAPTI NAHAR NIRMAN MANDAL 1 BALRAMPUR
As Per Tender Notice
2020_UPIDC_510194_2
04/S.E./2020-21
Open Tender
Civil Works - Canal
Item Rate
75 days
Balrampur
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
Online
₹2.9 L
Yes
Balrampur
2 Nov 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
17 Sept 2020
Amount
Earth work in excavation of foundation of masonary work on channels discharge above 10cumecs; including all leads & lifts and cost of all labour's T&P etc. as per direction of engineer in charge, complete work.
Laying C.C. A40 M-10 (1:3:6) mix in foundation of Kabrai & Hamirpur coarse sand of F.M. ≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work.
Laying C.C, A-20, M-15 in P.C.C. work with cement (OPC 43 Grade), coarse sand of Hamirpur, F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); includingall lead & lift with mechanical mixing & machinal vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying C.C, A-40, M-20 in P.C.C. work with cement (OPC 43 Grade), coarse sand of Hamirpur, F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing & machinal vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Cutting, bending, binding and placing TMT steel reinforcement bar; including all cost of all material, binding wire, labours, T&P etc. but excluding cost of scafolding, required for proper compltion of work.
Centring & shuttering for C.C. work,including all cost of material, labour, T&P etc. complete work.
Grove cutting in size 0.20 x 0.20m in old R.C.C. section for Seal jointing, excluding cost of sealing work; including cost of all T&P, labour etc complete work.
Providing and cutting, bending, brazing and crimping 335mm wide 20gauge of U-Type copper seal at construction joint at outer face and at inner side PVC/ rubber seal, as per approved shape and size requaired for proper completion of work; including cost of all materials, labour, T&P etc.
Supply and laying PVC rubber seal 300mm width & 10mm thick at joint including all complete work.
Providing and fixing bitumen cake30mm thick at construction joints gaps etc.; including all cost of materials, fuel wood, labour , T&P etc complete work
Providing & fixing G.P. sheat 22 SWG with cutting and crimping upto 30.00 cm wide seal for construction joints at requaired location for proper completion of work; including cost of all materials, labour, T&P etc.
Supply and fixing 90mm ɸ PVC pipe ISI mark, weep hole pipe in wall near canal bed @3.0m c/c horizontal and 0.75m c/c vertical in two rows of including cost of all materials, labour, T&P etc.
Supply & Laying inverted filter size 0.50x0.50x0.50m in three type mix; frist coarse sand (size 0.074 to 2.40mm gauge), second stone grit graded size 4.75 to 25mm gauge and third grade stone grit graded size 25 to 100mm gauge.
Supply & arrangement of borring for dewatering with 150 mm dia causing pipe for 12m long of 100mmØ M.S. pipe and stainar; including all cost of material, labour,T&P etc. required for proper completion of work.
Dewatering with all cost of power/POL machines, pump well, paint system & operator etc.with assembling and dismantling of equipment required; including all cost of material, labour, T&P etc. requaired for proper complection of work.
Earth work in embankment of wing wall back & right bank ramp filling; including all leads & lifts, ; including all leads & lifts, all cost of labour's, T&P etc. with manual compaction & requaired for proper complete work
Earth work in cutting/removing canal bed bandha; including all leads & lifts and cost of all labour's T&P etc. as per direction of engineer in charge, complete work.
Making temporary hutment for site store and site office purposes size 6.0 x 4.0m. Ukliptish strut, purlin of size 151 to 200 mm and chapper 10cm thick with bamboo frame and supply of parda with fresh materials & bamboo frame door; including all cost of material, labour, T & P etc. complete complete work as per direction of engineer-incharge.
M/S VIRAT CONSTRUCTION
M/S V.K. CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .