Tender Value
₹29.8 Cr
EMD Value
₹59.6 L
Closing Date
30 Jun 2026, 3:00 pm
Provision of Routers and Switches with Perpetual License and 3 Years Comprehensive Warranty for PRS Modernisation at Tier-2 & Tier-3 Locations and Last Mile Connectivity of all PRS Locations over Southern Railway
Proj1MS_PRS_2026_03
Proj1MS_PRS_2026_03
Open
9 Months
Unknown (Unspecified Location)
₹0
₹59.6 L
5 Jun 2026
5 Jun 2026
16 Jun 2026
B-Non SOR items
Item Breakup - A-SOR items
108000.00 CE3P certified panduit or Systimax or R&M or AMP or Molex or Krone Or D-LinkMakes
50.00 markers a s p e r drawing No.CSTE/CN/OFC/1. The lettering o n the cable marker shall be "SIG" / "TELE" / "OFC" as per the instructions o f Railway representative at site.) as per drawing enclosed
72000.00 pair/ 20 pair/50 pair) Cables in 1" PVC conduit/case c a p i n g a n d clamping on the wall/Roof tops/ Shelters w ith suitable clamping a n d h o s e t o be provided where ever bends/ curves (PVC conduit/ Case capping and other accessories to be supplied by the contractor)
14500.00 except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.5 Mtrs. (Laying of cables is not included in this schedule.)
250.00 duct, opening the slabs to accommodate additional cable laying, REPOSITIONING the slabs removed after the cables are laid and PLASTERING with cement mortar, and refilling the trench by ramming and consolidating it as per the instructions of Railway Representatives a t site. (Laying of cables is not included i n this schedule.) [Cement,M Sand and all other miscellaneous materials required for the work shall be supplied by the Contractor]. SR HQ-S AND T/SOUTHERN RLY
50.00 crossing of cables, refilling of trench by ramming a n d consolidating i t a s p e r the instructions of Railway representative at site after l a y i n g of DWC/RCC pipes. During excavation of trench, it has to be ensured that the excavated soil does not mix with the ballast available. The depth o f 1 m trench shall b e f r o m t h e bottom o f sleepers for track crossings. Laying o f cables and DWC pipes is not included in this schedule. (Supply of DWC/RCC pipes with couplers/collars is not included in this schedule).
50.00 crossing of cables, laying of DWC/ RCC pipes with collar/ coupling, refilling of trench by ramming and consolidating i t and resurfacing it to the original position. Laying of cables is not included in this schedule. (Supply o f D W C / R C C p i p e s with couplers/collars is not included in this schedule).
14500.00 throughout, with earth after laying of cables, and consolidating t h e t r e n c h by ramming and levelling."
50.00 300mmX300mm, casting of concrete foundation of size 300mmX300mmX300mm and Placing of RCC cable markers on top of the foundation and refilling the pit and consolidating it by ramming. The cable markers shall be provided at an interval of 20 Mtrs. within station limits a n d 5 0 Mtrs. outside station limits throughout t h e cable route, diversions and also at every track/road crossing."
f O F C cable/Power Metre cable/Signalling c a b l e i n s i d e permanently solid lubricated HDPE Pipe already laid. This work includes necessary d u c t integrity test for solid lubricated H D P E p i p e . ( This includes Transportation of materials from nominated stores to site)
10.00 23192.34 Technical specification
750.00 103.5mm inner dia & 120mm outer dia conforming to specification No. IS 14930(Part 2): 2001 with one coupler for every 6 m o f p i p e a s p e r Technical specification
10000.00 of 110 mm Outer Dia, 10 mm Wall Thickness, along with one coupler for every 6 Meters a s per specification N o . I S 4984: 2016 w i t h latest amendments and Material Grade:PE 80
14500.00 Orange, width o f 250mm (10") by printing with b l a c k letters 'India n RailwaySignal/Telecom/OFC Cable' on both sides
29500.00 (inner dia) with couplers
680.00 10502.00 Fibre management system (FMS) conforming to RDSO/SPN/TC- 37/2000(rev-3 a m d t - 1 o r latest similar to COMMSCOPE make or better, suitable for splicing and front patching 12F cable with all accessories and terminating the optical fibre cable with splicing and front patching in FMS in the Location Box. This includes Supply and Provision of 4 nos of Patch cords of required length (All other materials required for splicing are to be supplied by contractor)
100.00 600mm x 600mm with complete accessories
Metre SR HQ-S AND T/SOUTHERN RLY
1500.00 Crossing/Road Cutting/Trenches Total 28641175.90
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PRSRouterTenderDocument05.06.2026.pdf
ATTACHMENT
Letter_20082024_PPPMIIOrder2017-Revision1date20_8_24.pdf
ATTACHMENT
PMI-MII_PolicyGuidelines050420238.pdf
ATTACHMENT
StationListinSR.pdf
ATTACHMENT
SpecificationforLANSwitchver2.1.pdf
ATTACHMENT
RBletterforTTP.pdf
ATTACHMENT
CRISlatestspecTier234.pdf
ATTACHMENT
lettertoallCCMPMPSregmodificationintechnicalspecificationsofRoutersdated100220261.pdf
ATTACHMENT
GCCcorrectionslippart1.pdf