Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 L
EMD Value
₹1,400
Closing Date
28 Jan 2020, 2:30 pmClosed
SE EUCC V LESA LUCKNOW
Lesa bhawan near residency lucknow
For Replacement of old and damaged bare conductor of LT line into ABC and installed new pole in long span near Reserve Police line at Kalli Paschim Lucknow
2020_MVVNL_426849_1
32/EUCC V/2019-20
Open Tender
Electrical Works
45 days
Kalli Paschim Lucknow
as per tender documents
2 documents required · 2 mandatory
₹1,180
A/c. No. 00500200000456 IFSC CODE BARBOHAZARA BOB
₹1,400
7 Feb 2020
23 Jan 2020
28 Jan 2020
23 Jan 2020
28 Jan 2020
23 Jan 2020
Amount
Safe carriage including loading ,unloading & proper stacking of following materials from ESC LESA Daliganj/JE Store to work site.
LT-ABC 3X120+1X95+1X16 Sqmm
LT-ABC 3X50+1X35+1X16 Sqmm
ST- Pole 9 mtr long
Stay Set 16x1800 mm
Stay wire
M S Earthing Rod 20x2500 mm
LT- Distribution box 3 Phase
Fabrication & Erection of Single pole support for LT-ABC line on 09 mtr long ST- Pole with fixing of necessary clamps and other acessories like I/J hook & suspension clamp etc (All required materials will be provided by contractor except ST pole).
Digging of pit in Kachcha/Pakka land upto depth 1/6 length of pole for erection of single pole with proper alignment for LT-line and refilling with ramming of earth.
Grouting of pole upto depth 1/6 of length of pole in ratio 1:4:8 in cement, sand & brick balast as per RESPO norms (All required materials will be provided by contractor).
Construction of pole plinth 300mm x 45 mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per RESPO norms (All required materials will be provided by contractor).
Painting of ST-pole including Steel part with one coat Red oxide & two coats of best quality enamel paint ISI marks as per RESPO norms (All required materials will be provided by contractor).
Erection of stay set 16x1800 mm by digging of pit of size 0.4x0.6x1.6 m including grouting, binding, nuzzling and fixing of Stay insulator with Stay wire of size 7/10 SWG (All the materials provided by contractor except Stay rod (complete set) and Stay wire).
Stringing and sagging of LT-line on ABC 3x120+1x95+1x16 Sqmm including jumperring with clamp as per norms (ABC will be provided by department).
Stringing and sagging of LT-line on ABC 3X50+1X35+1X16 Sqmm Sqmm including jumperring with clamp as per norms (ABC will be provided by department).
Erection and commisioning of LT distribution box 3-phase on LT-pole with necessary clamps (Clamps will be provided by contractor).
Disconnection of existing service cable of consumers and reconnection of service cable from LT-DB after commisioning of LT- Distribution box.
Earthing of poles with MS-Earthing Rod 20x2500 mm, Earth wire with Nut & bolts as per norms (All materials will be provided by contractor except MS-Earthing Rod).
Supply and fixing of required nut and bolts of different sizes.
Straightening of tilted pole.
Regrouting/concreting and plinthing upto 300 mm above from ground level of existing pole
Replacement of damage/broken clamp of existing pole for stringing ABC (Clamps will be provided by contractor).
Cutting/trimming of tree branches which are touching in LT-line.
Removing of Old Conductor of LT-line, Rolling back & Carriage upto store centre Daliganj/Dump store.
CHAUHAN ELECTRICALS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid