Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹8.9 Cr
EMD Value
₹15.0 L
Closing Date
6 Jul 2026, 2:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Construction of RCC drain from Mohalla Duli intersection to Sadar Bazaar and Pt. Deendayal Upadhyay Marg Tiraha existing circular road drain, Firozabad.
2026_DOLBU_1156689_3
266/NNF_Nala/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹41,300
Municipal Corporation
₹15.0 L
Google Meet
25 Jun 2026
3 Jun 2026
6 Jul 2026
3 Jun 2026
6 Jul 2026
3 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be madeseparately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 255 | SqM | 93.71 | ₹23,896.05 |
| 2 | Dismantling bitumin road manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | 127.5 | CuM | 304.78 | ₹38,859.45 |
| 3 | Dismantling cement concrete road manually / by mechanical means including and disposal of material within 50 mtr. lead as per direction of Engineer in charge. Nominal concrete 1:3:6 or richer (i.e.equivalent designs) | 76.5 | CuM | 1,731.48 | ₹1,32,458.22 |
| 4 | Dismantling Reinforcement cement concrete work by manually / by mechanical means including stacking of steel bars and disposal of unservisable material within 50 mtr. lead as per direction of Engineer in charge.FOR Existing RCC Nalha | 1,425.6 | CuM | 2,526.01 | ₹36,01,079.86 |
| 5 | Deduct Quantity of Brick Bats of O. B. B. from Dismentalled Bricks | 997.92 | CuM | 373.35 | ₹3,72,573.43 |
| 6 | Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m. (Rate is over corresponding basic item for depth upto 1.5 metre). | 5,682.6 | CuM | 231.43 | ₹13,15,124.12 |
| 7 | Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 4.5 m, but not exceeding 4.5 m. (Rate is over corresponding basic item for depth upto 1.5 metre). | 813.44 | CuM | 277.72 | ₹2,25,908.56 |
| 8 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):
Depth not exceeding 1.5 m | 1,620 | SqM | 775.8 | ₹12,56,796 |
| 9 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):
Depth exceeding 1.5 m but not exceeding 3 m | 1,593 | SqM | 775.8 | ₹12,35,849.4 |
| 10 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):
Depth exceeding 3 m but not exceeding 4.5 m | 262.4 | SqM | 69.16 | ₹18,147.58 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
RFP.pdf
Tender Documents • 17.09 MB
BOQ_2167458.xls
BOQ • 0.30 MB
Corrigendum_Date_2.pdf
PDF • 0.34 MB
Corrigendum_Date.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .