| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.6 LAccepted-AOC | ₹85.6 L | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L2₹86.0 L+₹42,121.28 (0.49%)Rejected-Finance | ₹86.0 L+₹42,121.28 (0.49%) | L2 | Rejected-Finance work allotted to lowest quoted bidder |
| Sl No | Description | Qty | Unit | KHANIN DAS L1 | NABAJYOTI DEKA L2 |
|---|---|---|---|---|---|
| 1.00 | GUIDE BUND
Earthwork in filling in marginal bund/guide bund/afflux bund/canal embankment etc. to the desired section and grade by obtaining earth from out side borrow pit and filling in uniform layer notexceeding 15cm thick including clearing light jungles, removing tree up-to 15cm dia. and uprooting trees and stumps from the seat of embankment and borrow pit area ,breaking clods to not more then 10mm cub, ramming ,watering, dressing and roughening the seat of embankment and profiling etc. paying compensation of earth borrow from private land or forest land if any, with lead up to 30m and lift up-to 1.5m. Complete as directed. A. Ordinary Soil | 8,265.47 | cum | 249.95 ₹20,65,954.23 Lowest | 249.95 ₹20,65,954.23 Lowest |
| 2.00 | Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppyingof all materials with 23 cm to 30 cm size river boulder collected from a lead of50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of fillingth voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid inposition as per direction including necessary local carriage of materials payingnecessary forest royalty including providing 1.00 no. of whole Jati bamboohorizontal runner along the top of the sausage with vertical bhaluka bamboo post1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. allcomplete as directed. | 715.26 | cum | 7,137.02 ₹51,04,824.93 Lowest | 7,137.02 ₹51,04,824.93 Lowest |
| 3.00 | Collection and supply of one man size river blasted boulder from the Quarry to different work site including loading and unloading and stacking in measurable stack at site etc. complete as directed.(size 25 cm to 30cm)(Distance
=40 K.M)
(ii)Blasted boulder | 434.24 | cum | 2,288.06 ₹9,93,567.17 Lowest | 2,288.06 ₹9,93,567.17 Lowest |
| 4.00 | Labour charge for pitching one man size boulder including dressing and ramming the seat to proper size and slope of pitching etc with local carriage of boulder from a distance of 60 m and with lift upto 6m.Complete as directed | 434.24 | cum | 903 ₹3,92,118.72 Lowest | 1,000 ₹4,34,240 |
Tender Value
₹85.6 L
EMD Value
₹1.7 L
Closing Date
23 Dec 2025, 3:00 pmClosed
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
O/o the Addl. Chief Engineer cum CHD, Irrigation, BTC, Kokrajhar
Construction of Guide Bund at Harharia FIS under PMKSY (HKKP) for the year 2021-2022
2025_BoTC_48964_2
ACE/CHDI/10/2025/18 dated 01/12/2025
Open Tender
Civil Works
Works
365 days
BARAMA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,800
₹1.7 L
Yes
O/o the Addl. Chief Engineer cum CHD, Irrigation,
19 Jan 2026
1 Dec 2025
24 Dec 2025
1 Dec 2025
23 Dec 2025
5 Dec 2025
8 Dec 2025
Amount
GUIDE BUND Earthwork in filling in marginal bund/guide bund/afflux bund/canal embankment etc. to the desired section and grade by obtaining earth from out side borrow pit and filling in uniform layer notexceeding 15cm thick including clearing light jungles, removing tree up-to 15cm dia. and uprooting trees and stumps from the seat of embankment and borrow pit area ,breaking clods to not more then 10mm cub, ramming ,watering, dressing and roughening the seat of embankment and profiling etc. paying compensation of earth borrow from private land or forest land if any, with lead up to 30m and lift up-to 1.5m. Complete as directed. A. Ordinary Soil
Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppyingof all materials with 23 cm to 30 cm size river boulder collected from a lead of50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of fillingth voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid inposition as per direction including necessary local carriage of materials payingnecessary forest royalty including providing 1.00 no. of whole Jati bamboohorizontal runner along the top of the sausage with vertical bhaluka bamboo post1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. allcomplete as directed.
Collection and supply of one man size river blasted boulder from the Quarry to different work site including loading and unloading and stacking in measurable stack at site etc. complete as directed.(size 25 cm to 30cm)(Distance =40 K.M) (ii)Blasted boulder
Labour charge for pitching one man size boulder including dressing and ramming the seat to proper size and slope of pitching etc with local carriage of boulder from a distance of 60 m and with lift upto 6m.Complete as directed
NABAJYOTI DEKA (BID ID -290126)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
SBD2.pdf
Tender Documents • 1.56 MB
BOQ_77714.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .