| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | -7.05% | ₹17.8 L | L1 | Admitted-Finance |
| 2 | L2₹20.5 L+₹2.8 L (15.7%)Admitted-Finance | +7.50% | ₹20.5 L+₹2.8 L (15.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical not qualified |
Tender Value
₹19.1 L
EMD Value
₹38,220
Closing Date
14 Jul 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
c/o Jal Shakti Division Udhampur
Permanent restoration of damaged infrastructure of WSS Joffer WSS Rasli Thakrai and Chakal under SASCI 2026
2026_PHE_313250_5
e-NIT No. 16 of 2026-27
Open Tender
Civil Works - Others
Percentage
60 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE ENGINEER
₹38,220
20 Aug 2026
22 Jun 2026
15 Jul 2026
22 Jun 2026
14 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : 40% Ordinary rock 30% Hard rock blasting prohibited 30% | 49.79 | Cum | 531.38 | ₹26,457.41 |
| 2 | Dismantling G.I. pipes (external work) including excavation and refilling
trenches after taking out the pipes, manually/by mechanical means
including stacking of pipes within 50 meters lead as per direction of
Engineer-in-charge :
15 mm to 40 mm nominal bore. | 920 | Mtr | 109.65 | ₹1,00,878 |
| 3 | Dismantling G.I. pipes (external work) including excavation and refilling
trenches after taking out the pipes, manually/by mechanical means
including stacking of pipes within 50 meters lead as per direction of
Engineer-in-charge :
Above 40 mm nominal bore. | 555 | Mtr | 121.65 | ₹67,515.75 |
| 4 | Supply of stones | 10.08 | Cum | 700 | ₹7,056 |
| 5 | Dumping of stones in horizontol on level | 10.08 | Cum | 237.9 | ₹2,398.03 |
| 6 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 50mm dia | 555 | No | 44.85 | ₹24,891.75 |
| 7 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 40mm dia | 460 | Mtr | 44.85 | ₹20,631 |
| 8 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 32mm dia | 460 | Mtr | 33.7 | ₹15,502 |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth All kinds of soil : 1 mtr cutting edge | 190.5 | Cum | 413.4 | ₹78,752.7 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Arches, domes, vaults upto 6 m span | 11.68 | Sqm | 2,281.2 | ₹26,644.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1013686.xls
BOQ • 0.37 MB
16extend2.pdf
PDF • 0.46 MB
experience.pdf
PDF • 0.55 MB
16ex2.pdf
PDF • 0.46 MB
16.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .