Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC VILLAGE ISLAM PUR BISHNOI ALIAS BISHNOI WALA PO MAHESHRI JAAT TEHSIL NAGINA DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 Cr+₹11.4 L (4.07%)Rejected-Finance C 20 8 AVAS VIKAS COLONY HARDOI UTTAR PRADESH | HARDOI | HARDOI | UTTAR PRADESH | ₹2.9 Cr+₹11.4 L (4.07%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 Cr+₹13.1 L (4.67%)Rejected-Finance | ₹2.9 Cr+₹13.1 L (4.67%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.9 Cr+₹13.3 L (4.78%)Rejected-Finance | ₹2.9 Cr+₹13.3 L (4.78%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.0 Cr+₹16.6 L (5.95%)Rejected-Finance 11 4 KHANANCHI TOLA HARDOI | ₹3.0 Cr+₹16.6 L (5.95%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹17.1 L
Closing Date
16 Aug 2023, 3:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Construction work of Satautha Kundiya road to Barsana Link road with 5 years maintenance under RIDF-28 (NABARD) F.Y. 2022-23 in District Hardoi.
2023_CEUCZ_828479_1
2510M/1MT/E-TENDER/UC DATE 11-05-2023
Open Tender
Civil Works
Fixed-rate
330 days
HARDOI
Construction work of Satautha Kundiya road to Barsana Link road with 5 years maintenance under RIDF-28 (NABARD) F.Y. 2022-23 in District Hardoi.
2 documents required · 2 mandatory
₹2,714
₹17.1 L
Yes
8 Nov 2023
11 Aug 2023
16 Aug 2023
11 Aug 2023
16 Aug 2023
11 Aug 2023
eProcurement System Government of Uttar Pradesh Created By: SUMANT KUMAR Created Date/Time: 19-Sep-2023 04:13 PM Tender Title: Construction work of Satautha Kundiya road to Barsana Link road with 5 years maintenance under RIDF-28 (NABARD) F.Y. 2022-23 in District Hardoi. Tender ID: 2023_CEUCZ_828479_1
Tender Inviting Authority: SUPERINTENDING ENGINEER, UNNAO CIRCLE, PWD, UNNAO
Name of Work: Construction of Satautha Kundiya road to Barsana link road under NABARD Yojana (RIDF-28)
Tender inviting Notice No: 2510 M/1MT/EITENDER/UNNAO CIRCLE/22-23 DATE 11-05-2023
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 VIRENDRA SINGH(GSTN-09ARIPS0583K1Z6) 29728999.75 -5.99 27948232.66 Two Crore Seventy Nine Lakh Fourty Eight Thousand Two Hundred and Thirty Two
2.00 M/S KUMUD BUILDERS(GSTN-09AAJFK0047JIZ9) 29728999.75 -1.50 29283064.75 Two Crore Ninty Two Lakh Eighty Three Thousand Sixty Four
3.00 M/S BRAMHA NAND DIXIT(GSTN-NA) 29728999.75 -1.60 29253335.75 Two Crore Ninty Two Lakh Fifty Three Thousand Three Hundred and Thirty Five
4.00 M/S Ram Sewak Har Govind Sahai(GSTN-NA) 29728999.75 -.40 29610083.75 Two Crore Ninty Six Lakh Ten Thousand Eighty Three
5.00 RAJEEV NARAIN(GSTN-NA) 29728999.75 -2.16 29086853.36 Two Crore Ninty Lakh Eighty Six Thousand Eight Hundred and Fifty Three
Lowest Amount Quoted BY: VIRENDRA SINGH(27948232.66)
BOQ Summary Details Tender Title: Construction work of Satautha Kundiya road to Barsana Link road with 5 years maintenance under RIDF-28 (NABARD) F.Y. 2022-23 in District Hardoi. Tender ID: 2023_CEUCZ_828479_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 VIRENDRA SINGH 27948232.66 L1
2 RAJEEV NARAIN 29086853.36 L2
3 M/S BRAMHA NAND DIXIT 29253335.75 L3
4 M/S KUMUD BUILDERS 29283064.75 L4
5 M/S Ram Sewak Har Govind Sahai 29610083.75 L5
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .