| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.1 CrAdmitted-Finance | -21.15% | ₹18.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.4 CrAdmitted-Finance | -20.10% | ₹18.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹18.7 CrAdmitted-Finance | -18.80% | ₹18.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹21.2 CrAdmitted-Finance | -7.79% | ₹21.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹21.7 CrAdmitted-Finance | -5.65% | ₹21.7 Cr | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹23.0 L
Closing Date
20 Feb 2026, 3:30 pmClosed
SE, Construction Circle. U.P. Jal Nigam(
Office of SE, Construction Circle. U.P. Jal NigamU Gorakhpur
Uska Bajar Reorganization Water Supply Scheme in Nagar Panchayat Uska BazarDistrict Siddharthnagar
2026_UPJNM_1107882_1
55/v-15/18 dt.20.01.2026
Open Tender
Civil Works - Water Works
Percentage
455 days
Uska BazarNagar Panchayat, Siddharth Nagar U.P.
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
EE CD U.P. Jal Nigam Urban Basti
₹23.0 L
Office of SE, Construction Circle. U.P. Jal Nigamu
29 Apr 2026
24 Jan 2026
20 Feb 2026
24 Jan 2026
20 Feb 2026
24 Jan 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | REPAIRING OF PUMP HOUSE AND STAFF QUARTER | - | - | - | - |
| 2 | Repairing and painting of all Existing Pump House including all material labour t&p etc completion of work as per direction of engineer incharge. | 1 | No. | 2,22,604 | ₹2,22,604 |
| 3 | Repairing and painting of Existing Staff Quarter including all material labour t&p etc completion of work as per direction of engineer incharge. | 1 | No. | 1,89,981 | ₹1,89,981 |
| 4 | Construction of Artificial Recharging of Ground water through roof top rain water of pump house , by pas chamber and over flow of OHT including all material, labour,T&P etc.required for proper completion of work in the direction of Engineer in charge. | 5 | No. | 3,27,189.5 | ₹16,35,947.5 |
| 5 | Construction of Master control room(MCS) as per Structural Design Drawing of relevant seismic Zone including cost of soil testing , Structural designing as per direction of Engineer-in-charge. | 1 | job | 15,87,396.8 | ₹15,87,396.8 |
| 6 | STAFF QUARTER | - | - | - | - |
| 7 | Provide all material, labour, T&P Complete and soil Testing, Structural Design Drawing as per relevant seismic Zone Construction of a single room set staff Quarter as per endicated elevation and plan. | 4 | No. | 10,86,154 | ₹43,44,616 |
| 8 | Add extra for 0.60 meter hight of plinth of pump house due to low ground leval. | 2 | No. | 71,962.5 | ₹1,43,925 |
| 9 | Add extra for 0.70 meter hight of plinth of pump house due to low ground leval. | 1 | No. | 83,956.25 | ₹83,956.25 |
| 10 | Add extra for 0.50 meter hight of plinth of pump house due to low ground leval. | 1 | No. | 59,968.75 | ₹59,968.75 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
UskaBid.pdf
Tender Documents • 9.58 MB
BOQ_2047637.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].