| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹2.8 L+₹80,655 (40.6%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.7 L
EMD Value
₹3,000
Closing Date
19 Mar 2021, 11:00 amClosed
SE, EDC-II BULANDSHAHR
SE, EDC-II BULANDSHAHR
ELECTRIFICATON WORK IN FULL DEPOSIT SCHEME BY MOUNTING OF 250 KVA TRANSFORMER IN ASRA AWAS YOJNA UNDER EDD-IV SYANA
2021_PVVNL_552757_1
25/EDC-II/BSR/2020-2021
Open Tender
Electrical Works
Lump-sum
30 days
EDD-SYANA
ELECTRIFICATON WORK IN FULL DEPOSIT SCHEME BY MOUNTING OF 250 KVA TRANSFORMER IN ASRA AWAS YOJNA UNDER EDD-IV SYANA
2 documents required · 2 mandatory
₹1,180
SE, EDC-II BULANDSHAHR
₹3,000
20 Mar 2021
8 Feb 2021
19 Mar 2021
8 Feb 2021
19 Mar 2021
8 Feb 2021
Amount
Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
St Pole 13 mtr/PCC Pole 8.5 mtr Long.
Carriage of All line Material from store to j.e store Sub-station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. Earth wire, M.S. Channel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete 1 I.T. fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double Pole support including complete 1 I.T. fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
fixing of 11 kv Stay rod with Stay wire in proper way with Nozelling.
Grounting of 11 Kv Stay Rod.
Carriage of line Material from J.E store to Site as ACSR Weasel Conductor, ABC Conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Laying, sagging. Stringing and binding and jumpering of ACSR weisal, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR weisal conductor.
ABC Cable 3*95 Square MM.
Carriage of 250 Kva transformar
Making of Plinth 250 KVA Transformer.
Installation of 250 Kva transformar
11 KV XLPE Cable 3x70 mm Sq.
Fixing of Earthing rod.
The following material is required to be supplied by the contractor.
Distribution Box.
LT Clamp.
Holding Clamp
Bolt & nut off size.
Stay Clamps for 11 KV
Stay Insulator for 11 KV.
NEHA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .