Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | ₹41.5 L | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹42.8 L+₹1.3 L (3.12%)Rejected-AOC | ₹42.8 L+₹1.3 L (3.12%) | L2 | Rejected-AOC Not Being Lowest |
| 3 | L3₹43.8 L+₹2.3 L (5.49%)Rejected-AOC 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹43.8 L+₹2.3 L (5.49%) | L3 | Rejected-AOC Not Being Lowest |
| 4 | L4₹44.3 L+₹2.8 L (6.86%)Rejected-AOC 94A APR COLONY BILHARI JABALPUR MP | JABALPUR | MADHYA PRADESH | 482020 | ₹44.3 L+₹2.8 L (6.86%) | L4 | Rejected-AOC Not Being Lowest |
| 5 | L5₹44.6 L+₹3.1 L (7.51%)Rejected-AOC | ₹44.6 L+₹3.1 L (7.51%) | L5 | Rejected-AOC Not Being Lowest |
| Sl No | Description | Qty | Unit | Tropical Refrigeration L3 | SKY GROUP L2 | Ravi Enterprises L4 | DHAKSHNA MOORTHY AND SON L1 | ISLAND SALES ENTERPRISES L6 | M/s Karbhagam Sales Agency L5 | KRISHNA TRADING COMPANY L8 | Chandra Construction Enterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete of any description ad in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and directed. | 9.5 | Cubic Metre | 2,350 ₹22,325 | 2,230 ₹21,185 | 2,260 ₹21,470 | 2,100 ₹19,950 Lowest | 2,420 ₹22,990 | 2,310 ₹21,945 | 2,690 ₹25,555 | 2,560 ₹24,320 |
| 2.00 | Demolition of brick work / stone boulder / PCC block masonary, built in cement mortar or cement lime mortar including all quoins, arches pillars, etc but excluding ashlar facing, dressed stone works, precast concrete articles and precast concrete block wallings complete all as specified and as directed. | 5 | Cubic Metre | 2,165 ₹10,825 | 2,130 ₹10,650 | 2,230 ₹11,150 | 2,000 ₹10,000 Lowest | 2,230 ₹11,150 | 2,135 ₹10,675 | 2,356 ₹11,780 | 2,236 ₹11,180 |
| 3.00 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc laid and bedded and pointed in any mortar all as specified and as directed. | 30 | Ten Square Metre | 530 ₹15,900 | 523 ₹15,690 | 540 ₹16,200 | 500 ₹15,000 Lowest | 540 ₹16,200 | 526 ₹15,780 | 598 ₹17,940 | 562 ₹16,860 |
| 4.00 | Demolition of cement concrete in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 47.5 | Cubic Metre | 1,270 ₹60,325 | 1,250 ₹59,375 | 1,260 ₹59,850 | 1,200 ₹57,000 Lowest | 1,280 ₹60,800 | 1,265 ₹60,087.5 | 1,326 ₹62,985 | 1,290 ₹61,275 |
| 5.00 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out getting out complete all as specified and as directed. | 3 | Cubic Metre | 465 ₹1,395 | 442 ₹1,326 | 450 ₹1,350 | 430 ₹1,290 Lowest | 472 ₹1,416 | 450 ₹1,350 | 488 ₹1,464 | 485 ₹1,455 |
| 6.00 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and as directed. | 2.4 | Cubic Metre | 632 ₹1,516.8 | 612 ₹1,468.8 | 620 ₹1,488 | 600 ₹1,440 Lowest | 644 ₹1,545.6 | 625 ₹1,500 | 677 ₹1,624.8 | 655 ₹1,572 |
| 7.00 | Removing excavated material (soil) n exc 50 m and depositing where as directed at a level n.exc 1.5 m above the starting point complete all as specified and as directed. | 1.6 | Cubic Metre | 469 ₹750.4 | 465 ₹744 | 480 ₹768 | 450 ₹720 Lowest | 480 ₹768 | 465 ₹744 | 512 ₹819.2 | 495 ₹792 |
| 8.00 | Material and labour for plain cement concrete 1:4:8 type D2 using 40 mm graded stone aggregate as in foundation filling and mass concrete including necessary form work complete all as specified and as directed. | 1 | Cubic Metre | 16,850 ₹16,850 | 16,650 ₹16,650 | 16,700 ₹16,700 | 16,500 ₹16,500 Lowest | 16,950 ₹16,950 | 16,800 ₹16,800 | 17,250 ₹17,250 | 17,120 ₹17,120 |
| 9.00 | Material and Labour for reinforced cement concrete 1:2:4 type B1 using 20mm graded granite stone aggrgate as in Columns, pillars, piers, posts and struts and the like complete all as specified and directed.
Note : Reinforcement and form work shall be measured and paid separately. | 5 | Cubic Metre | 24,720 ₹1,23,600 | 24,650 ₹1,23,250 | 25,200 ₹1,26,000 | 24,000 ₹1,20,000 Lowest | 25,000 ₹1,25,000 | 25,300 ₹1,26,500 | 25,720 ₹1,28,600 | 25,630 ₹1,28,150 |
| 10.00 | Material and labour for providing reinforced cement concrete 1:2:4 type B1 nominal mix using 20mm graded stone aggregate as in in Beams, cantilevers, bressummers, lintels upto 1.5m clear span and the like complete all as specified and as directed.
Note : Reinforcement and form work shall be measured and paid separately. | 3 | Cubic Metre | 24,680 ₹74,040 | 24,650 ₹73,950 | 24,800 ₹74,400 | 24,000 ₹72,000 Lowest | 24,900 ₹74,700 | 24,650 ₹73,950 | 25,200 ₹75,600 | 25,100 ₹75,300 |
Tender Value
₹41 L
EMD Value
₹82,000
Closing Date
25 Jul 2026, 6:00 pmClosed
GE 866 EWS CARNICOBAR
GE 866 EWS CARNICOBAR PIN-913866 C/O 99APO
REPAIR TO FENCING, CHEQUERED TILE PATH, HARD STANDING, PERIMETER/ SECURITY WALL AND JAFFRI WALL AND SA RANGE AT AF STN CARNICOBAR
2026_MES_762572_2
8801/E8
Open Tender
Civil Works
Item Rate
365 days
GE 866 EWS CARNICOBAR AIR FORCE STATION
As per tender documents
9 documents required · 9 mandatory
₹500
GE 866 EWS
₹82,000
Yes
8 Sept 2026
11 Jul 2026
1 Aug 2026
11 Jul 2026
25 Jul 2026
18 Jul 2026
11 Jul 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of reinforced cement concrete of any description ad in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and directed. | 9.5 | Cubic Metre | - | - |
| 2 | Demolition of brick work / stone boulder / PCC block masonary, built in cement mortar or cement lime mortar including all quoins, arches pillars, etc but excluding ashlar facing, dressed stone works, precast concrete articles and precast concrete block wallings complete all as specified and as directed. | 5 | Cubic Metre | - | - |
| 3 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc laid and bedded and pointed in any mortar all as specified and as directed. | 30 | Ten Square Metre | - | - |
| 4 | Demolition of cement concrete in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 47.5 | Cubic Metre | - | - |
| 5 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out getting out complete all as specified and as directed. | 3 | Cubic Metre | - | - |
| 6 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and as directed. | 2.4 | Cubic Metre | - | - |
| 7 | Removing excavated material (soil) n exc 50 m and depositing where as directed at a level n.exc 1.5 m above the starting point complete all as specified and as directed. | 1.6 | Cubic Metre | - | - |
| 8 | Material and labour for plain cement concrete 1:4:8 type D2 using 40 mm graded stone aggregate as in foundation filling and mass concrete including necessary form work complete all as specified and as directed. | 1 | Cubic Metre | - | - |
| 9 | Material and Labour for reinforced cement concrete 1:2:4 type B1 using 20mm graded granite stone aggrgate as in Columns, pillars, piers, posts and struts and the like complete all as specified and directed.
Note : Reinforcement and form work shall be measured and paid separately. | 5 | Cubic Metre | - | - |
| 10 | Material and labour for providing reinforced cement concrete 1:2:4 type B1 nominal mix using 20mm graded stone aggregate as in in Beams, cantilevers, bressummers, lintels upto 1.5m clear span and the like complete all as specified and as directed.
Note : Reinforcement and form work shall be measured and paid separately. | 3 | Cubic Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
8801Tender2.pdf
Tender Documents • 0.95 MB
BOQ_871290.xls
BOQ • 0.33 MB
Testing8801.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .