Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
21 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPSI TM Unit II Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines in Unit II during Annual Overhauling 2026 27
2026_EB_711150_1
CE / MTPS-I / SE / M-I / TM /OT. 150 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹7,500
Yes
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Overhauling of GV 250 /250 ATA III Gr. MO with Bypass Valve:
Dismantling the valve, cleaning all the parts, checking the actuator bearings, seating surfaces. Lapping the gate and seat for perfect blue matching, reassembling the valve with new self-sealing ring and gland packing. Checking and cleaning the actuator thrust base bearing and lubrication to the bearings. | 3 | Nos | - | - |
| 2 | Overhauling of GV 10"/1500 Class HO and PNRV 250 / 250 ATA, SCNRV 300 /150 Class, GV/GLV 10 “/150, 300 class, 12 “/150, 300 class: Dismantling the valve, cleaning all the parts, Checking the seating surfaces. Lapping the gate/seat & flap/disc for perfect blue matching. Reassembling the valves with new self-sealing ring, bonnet gaskets and gland packing rings. | 6 | Nos | - | - |
| 3 | Overhauling of GV 300/250 ATA III gr. MO/HO valve with Bypass valve. Dismantling the valve, cleaning all the parts, checking the seating surfaces and Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self-sealing ring and gland packings. Checking and cleaning the actuator thrust base bearing and lubrication to the bearings. | 3 | Nos | - | - |
| 4 | Overhauling Of GV 100/250 ATA IX Gr M.O, GLV 4” Class 2500 M.O.
Dismantling the valve, cleaning all the parts, checking the seating surfaces and actuator bearings. Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self-sealing ring and gland packings. | 4 | Nos | - | - |
| 5 | Overhauling of GV 100 / 250 ATA III Gr. HO, GV 65 /250 ATA III Gr. MO/HO, GV 2.5”, 4" 2500 Class HO/MO valves. Dismantling the valve, cleaning all the parts, checking the seating surfaces. Bearings. Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self-sealing ring and gland packings. | 12 | Nos | - | - |
| 6 | Overhauling of GV 200 / 250 ATA M.O, GV 200 / 600 Class M.O, SCNRV 400,600mm/ 150 Class GV 500,600mm/ 150 Class.
Dismantling the valve/NRV cleaning all the parts checking the seating surfaces and actuator bearings, Lapping the gate / seat / flap for perfect blue matching, reassembling the valve with new self-sealing ring / bonnet gasket and gland packings. | 3 | Nos | - | - |
| 7 | Overhauling of GV, GLV 200 / 40 ATA, HO/MO, SCNRV 250 / 300/ 40 ATA, Control valve 6" x 6" / 300 class, GV 250 / 40 ATA H.O, 2.5”, 4” / 150, 300 class. Dismantling the valve, cleaning all the parts, checking the seating surfaces and actuator bearings. Lapping the gate / seat / flap for perfect blue matching, Re-assembling the valve with new bonnet gaskets and gland packings. | 8 | Nos | - | - |
| 8 | Overhauling of GV 300/ 16 ATA MO, GV 300/40 ATA HO, GLV 200/ 40 ATA MO, Control valve 10 ” x 10" / 300 class.
Dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings. | 7 | Nos | - | - |
| 9 | Overhauling of control valve size 4”x2.5”/ 1500 class
Dismantling the valve, cleaning all the parts, checking the seating surfaces Reassembling the valve with new Tech seal Bonnet, Tech seal for body, Stack, Gauge and gland packing. Checking and cleaning the Pneumatic actuator and lubrication to the bearings, fixing the actuator on the valve. | 3 | Nos | - | - |
| 10 | Overhauling of NRV 100/250 ATA , GLV 100 / 40 , 16 ATA, GLV 4” / 600, 300 class HO / MO , SCNRV 150/ 40, 16 ATA, SRV 2.5 ” X4 ” / 300 Class ,GV 350/125 class & GV 300/125 class, GV150/64 ATA HO, SCNRV 350/125 Class.
Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/ seat/ disc/flap for perfect blue matching. Reassembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing and apply lubrication. | 4 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_854400.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .