Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -8.10% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 CrAdmitted-Finance E 58 61 PHASE 1 ASHOK VIHAR COLONY PAHARIYA DISTRICT VARANASI | VARANASI | VARANASI | UTTAR PRADESH | -6.89% | ₹2.4 Cr | L2 | Admitted-Finance |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
10 Jun 2026, 5:00 pmClosed
EE
Arvind kumar sharma 7518102825
Beautification work of Thatheri Gali, Bengali Tola Street located under Zone-03 (Dashaswamedh).
2026_UPVDA_1149013_1
260/VDA/NIRMAN/2026-27
Open Tender
Civil Works
Percentage
270 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,900
Secretary Varanasi Development Authority
₹5.2 L
23 Jun 2026
15 May 2026
11 Jun 2026
15 May 2026
10 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Description of item | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 Sqm on plan)including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. (DSR 2023, SI No. 2.6.1) | 797.52 | Cum | 134.38 | ₹1,07,170.74 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (DSR 2023, SI No. 2.25) | 239.26 | Cum | 148.38 | ₹35,501.4 |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (DSR 2023, SI No. 4.1.8) | 145.94 | Cum | 5,157.02 | ₹7,52,615.5 |
| 5 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 (DSR 2023, SI No. 16.78) | 211.8 | Cum | 2,410 | ₹5,10,438 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).Slab (DSR 2023, SI No. 5.3). | 54.54 | Cum | 8,710.24 | ₹4,75,056.49 |
| 7 | As in item 5 but for the lighter beams i.e. having spans upto 6 m.(DSR 2023, SI No. 5.3) | 2.22 | Cum | 8,710.24 | ₹19,336.73 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) (DSR 2023, SI No. 5.1.2) | 58.75 | Cum | 6,848.09 | ₹4,02,325.29 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement (DSR 2023, SI No. 5.2.2) : | 50.58 | Cum | 8,216.23 | ₹4,15,576.91 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo- Mechanically Treated bars of grade Fe-500D or more. (DSR 2023, SI No. 5.22.6) | 255.32 | Qtl | 8,164.78 | ₹20,84,631.63 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
RFP.pdf
Tender Documents • 0.80 MB
BOQ_2150840.xls
BOQ • 0.42 MB
1149013.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].