Tender Value
₹7.8 L
EMD Value
₹7,850
Closing Date
5 Aug 2026, 3:00 pm
blcok development officer vp
devakottai
csc toilet at selugai in devakottai
2026_RDTN_686685_1
CSC Toilet at selugai in devakottai
Open Tender
Civil Works
Item Wise
devakottai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,850
5 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF CSC TOILET AT SELUGAI (NEAR PANCHAYAT UNION MIDDLE SCHOOL ) IN SELUGAI PANCHAYAT | - | - | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc | 6.93 | cum | - | - |
| 3 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site etc | 27.48 | cum | - | - |
| 4 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. - Column Below Ground Level | 5.52 | sqm | - | - |
| 5 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. - Below Ground Level | 23.12 | sqm | - | - |
| 6 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. - Slab & sunshade | 19.46 | sqm | - | - |
| 7 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items etc | 678.68 | Kg | - | - |
| 8 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site | 8.89 | cum | - | - |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 17.43 | sqm | - | - |
| 10 | Plastering with cement mortar 1:5, 12mm thick including cost & conveyance of all materials to work site etc | 246.36 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_825428.xls
BOQ • 0.36 MB
extensionofdate.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].