| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹76,986.35Admitted-Finance | -0.05% | ₹76,986.35 | L1 | Admitted-Finance |
| 2 | L2₹77,009.46Admitted-Finance | -0.02% | ₹77,009.46 | L2 | Admitted-Finance |
| 3 | L3₹77,063.37Admitted-Finance | +0.05% | ₹77,063.37 | L3 | Admitted-Finance |
Tender Value
₹77,000
EMD Value
₹7,700
Closing Date
17 Apr 2026, 5:00 pmClosed
PO DUDA BUDAUN
PO DUDA BUDAUN
REFER TENDER DOCUMENT
2026_SUDA_1131036_19
1537/DUDA/E-TENDER/2025-26 DT250326
Open Tender
Civil Works - Roads
90 days
BUDAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
Yes
PD JILA NAGARIYA GARIBI UNMOOLAN NIDHI BUDAUN
₹7,700
23 Apr 2026
28 Mar 2026
18 Apr 2026
28 Mar 2026
17 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Carted Earth work in filling or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the including cartage of 5 klm | |||||
| 2Concrete with 4cm(1½"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 1:4:8 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work. SI No. 275 | |||||
| 3First class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I. No. 307 | |||||
| 412 mm thick plaster 1:3 cement cousand mortar including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I. No. 583 | |||||
| 5Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge. | |||||
| 6Cement concrete with 2 cm. (1") gauge approved stone, grit approved coarse sand and cement in the proportion of 3:1.5:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI No. 279(ii) | |||||
| 7Reinforced Cement concrete with 2 cm. gauge approved stone, ballast, approved coarse sand and cement in the proportion of 3:1.5:1 in door and pilinth band excluding supply of all materials, labour and T&P etc. required for proper completion of the work. | |||||
| 8Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over ….of all steel and wastage and over lapping & hooks.(S.I.NO.504) | |||||
| 9Sign board | |||||
| 10Shashan deduction (less 5%) | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_2110201.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid