Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.8 L+₹1,759.07 (0.15%)Rejected-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.8 L+₹3,602.59 (0.31%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
1 Nov 2019, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Water supply arrangement at Ganga Sagar Main Mela Ground in connection with Ganga Sagar Mela 2020
2019_PHED_246388_1
WBPHE/EE/SMD/NIeT- 09 of 2019-2020
Open Tender
MECHANICAL
Item Rate
60 days
Ganga Sagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹26,000
Yes
14 Sept 2020
27 Sept 2019
6 Nov 2019
27 Sept 2019
1 Nov 2019
27 Sept 2019
Amount
Carrying & installation of 10 KVA/ 15 KVA gen set at different tube wells of mela ground by supplying required materials as per direction of EIC. [Contractor camp and Electric camp]
Running & maintenance of different capacity engine driven generator set at different Tube wells & ground reservoir [tank no.1 & 2] by supply of fuel, lubricant, sundries and skilled personnel including supplying of mobil and lubricants during running period as necessary as per direction of EIC for running Submersible pump set up to the end of Mela. [Contractor camp and Electric camp]
Running different capacity submersible pump sets at different tube well by supplying skilled operating staff as per direction of EIC for filling water to Tank No. 1, 2 & 3 and filling the reservoir as well as boosting during the Mela period. [Kali Mandir, Electric camp, Road No.1, Contractor camp, Tank No.2, Road No.3, Road No.3A, Road No.4, Road No.5(Sea side), Road No.5 (Latrine), D.M. Compound, Back side of Urmimukhar, Helipad, Forest, Jora Tank, Medical & Bus stand
Temporary fixing of departmentally supplied Al. Ar. cable along the lenth of O.H. pole by MS pole clamps fabricated from 25 mm x 6 mm MS flat incl. painting [MS pole clamp will be supplied departmentally] and dismantling and storage of all materials as per direction after completion of mela
Carrying charges of PDB cum changeover panel, centifugal pump motor set, valve, M.S pipes, CI duck foot bends, fittings specials, Flanges, nipple, blank flanges, nuts, bolts, gaskets etc, suction hose with its accessories, pressure gauge, copper cable etc. from departmental store at Ganga Sagr to work site. [for Pond No.1, 2 & 3]
For Pond No.1
For Pond No.2
For Pond No.3
Installation of the PDB cum changeover panel, centifugal pump motor set on the foundation and fitting fixing of of all items as mentioned in Sl. No.5 with supply of necessary minor items if required for installation of pumping machinery, including cable termination with supply of brass compensation glands and other accessories for LT cables earthing as per IE Rules and up to the entire satisfaction of EIC. Rate includes hire charges of generator, welding sets, fuels lubricants etc. for completion of work.
For Pond No.1
For Pond No.2
For Pond No.3
Painting of the delivery line, common header line and all the valves and specials by two coats of paint over two coats of primer as per approved brand and shade and as per direction of EIC.
For Pond No.1
For Pond No.2
For Pond No.3
Withdrawing the generating set from the existing position where installed for water supply after mela including storage to departmental Store at Ganga Sagar as per direction of E.I.C.
Carrying of 15 Nos. departmental power distribution panel board, cable from store to different tube well site and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply to pumping machinery including electrical inter connection from departmental Panel Board to pump motor, chlorine machine etc. before 01.01.2019 including proper earthing arrangement complete as per direction of EIC.
Running of centrifugal pump motor sets at pond by engaging skilled operating staff as per direction of EIC for water supply during the Mela period as per direction
For Pond No.1
For Pond No.2
For Pond No.3
Supply and delivery of the following materials: -
Bleaching powder having 33% free chlorine as per I.S.S. 25 Kgs. In watch bag (make: DCM/ Kanoria/ any other approved make) for tank No. 1,2 & 3)
Crystal type alum.
Chlorinating arrangement of reservoir No.1, 2 & 3 time to time with the help of above materials in Sl. No. 7 & rope and bags per direction of E.I.C.
Dismantling of the pump motor set, suction pipe with its accessories, delivery pipe line, panel board etc. after disconnection of power line after completion of mela and storage at same at deparmental store as per direction
For Pond No.1
For Pond No.2
For Pond No.3
Carrying back of PDB cum changeover panel, centifugal pump motor set, valve, M.S pipes, CI duck foot bends, fittings specials, Flanges, nipple, blank flanges, nuts, bolts, gaskets etc, suction hose with its accessories, pressure gauge, copper cable etc. from work site to departmental store at Ganga Sagr as per direction.
For Pond No.1
For Pond No.2
For Pond No.3
Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation and back after mela period as per direction of EIC.
Carrying of diesel generator set from Ganga Sagar Store to work site for installation near tube well at main island and back after mela period as per direction of EIC. [2 times]
Installation of diesel Generator set near tube well after making temporary foundation by wooden plank of required size with making proper shed including installation of submersible pump motor set as per direction with supplying of all required materials.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department.
Running & maintenance of engine driven generator set at tube well by supply of fuel, lubricant, sundries and skilled personnel including adding of mobil and lubricants during running period as necessary as per direction of EIC for running Submersible pump set up to the end of Mela. From 25-12-2019 to 17-01-2020 = 24 days x 8 KW x 10 Hrs.
Running of submersible pump sets at tube well by supplying skilled operating staff as per direction From 25-12-2019 to 17-01-2020 = 24 days x 10 Hrs.
Withdrawing the generating set from the existing position where installed for water supply after mela including storage to departmental Store at Ganga Sagar as per direction of E.I.C.
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Guarding arrangement of the whole installation of the above item for the entire period round the clock.
Add GST @ 12%
NITESH MANAGEMENT
H.K.DAS AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .