Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
29 Jun 2026, 2:00 pm2d left
Similar tender results from the same govt authority in the past 3 years.
EE PD PWD BAGHPAT
EE PD PWD BAGHPAT
In the financial year 2026-27 Construction Work of approved Inter level Biology laboratory in Government Girls Inter College, Daha in District Baghpat.
2026_CEMRT_1163041_1
1304/3A Date 15-05-2026
Open Tender
Civil Works - Buildings
180 days
EE PD PWD BAGHPAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹856
₹1.1 L
EE PD PWD BAGHPAT
23 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation frenches. SOR 2022 SI.No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 47 | Cum | 90 | ₹4,230 | BI01010001010000000000000515BI0100001113 |
| 2 | Cement Concrete with 4 cm gauge approved 8:4:1 stone Ballast, Coarse sand and cement the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 281. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 15 | Cum | 4,470 | ₹67,050 | BI01010001010000000000000515BI0100001114 |
| 3 | M-150 Brick Work in 1:6 (One cement & six fine sand of 1.25 F.M.) mortar, materials labour, Tools & plants etc., required for proper completion of the work. SOR 2022 SI.No. 303. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 29 | Cum | 3,750 | ₹1,08,750 | BI01010001010000000000000515BI0100001115 |
| 4 | E/W in filling in foundation in ordinary soil complete in all respect. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 52 | Cum | 150 | ₹7,800 | BI01010001010000000000000515BI0100001116 |
| 5 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from the site of work and including watering, dressing etc. labour and T&P etc. required for proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a distance of 50 M. out side the periphery of area cleared. including cost of sand. SOR 2022 SI.No. 255. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 13 | Cum | 380 | ₹4,940 | BI01010001010000000000000515BI0100001117 |
| 6 | 12 mm thick plaster with 1:4 cement and corse sand of 1.25 fineness modules in ever brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 584a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 61 | Sqm | 155 | ₹9,455 | BI01010001010000000000000515BI0100001118 |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. SOR 2022 SI.No. 283. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 3.9 | cum | 5,950 | ₹23,205 | BI01010001010000000000000515BI0100001119 |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. SOR 2022 SI.No. 284a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 15 | cum | 6,330 | ₹94,950 | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and fixing 1mm thich M.S. Sheet door with frame of 40x40x6mm (1/2"x12"x4") angle iron 3.15 mm (1/8") thick M.S. gus set plate at the junction and corners including supply and fixing of necessary fittings. Lock rail of 15" length of oxidised iron and including pintels hooks at the top and applying priming coat of red lead paint on all sides complete. SOR 2022 SI.No. 517a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 12 | qtl | 6,190 | ₹74,280 | BI01010001010000000000000515BI0100001121 |
| 10 | M-150 Brick Work in 1:6 (One cement & six fine sand of 1.25 F.M.) mortar, materials labour, Tools & plants etc., required for proper completion of the work. SOR 2022 SI.No. 303+309+310. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 40 | cum | 4,180 | ₹1,67,200 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_2180255.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid