Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | ₹10.1 L | L1 | Admitted-Finance |
| 2 | L2₹11.4 LAdmitted-Finance 27 KARUPANAN STREET NAICKEN KADU GOBI 638 476 ERODE DIST | GOBI | ERODE | TAMIL NADU | 638476 | ₹11.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S RATHIKA CONSTRUCTIONS L1 | P.V.CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard Specification as directed by the Engineer at site. | 117.51 | M3 | 150 ₹17,626.50 | 100 ₹11,751 |
| 2.00 | Earth work excavating for foundation in depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting as per standard Specification as directed by the Engineer at site. | 114.81 | M3 | 200 ₹22,962 | 100 ₹11,481 |
| 3.00 | Earth work excavation for Foundation in Hard rock by Wedging and Chiseling and trimming to proper shape where blasting is prohibited and stacking for measurements including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site. | 3 | M3 | 1,000 ₹3,000 | 10 ₹30 |
| 4.00 | Filling the foundation and floor with M Sand including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete. | 8 | M3 | 1,500 ₹12,000 | 1,000 ₹8,000 |
| 5.00 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal, including cost of cement, all materials, labour charges including solidation, curing, all leads, lifts, as per standard specification etc., complete. | 11 | M3 | 5,700 ₹62,700 | 7,500 ₹82,500 |
| 6.00 | Providing concrete road with P.C.C. 1:3:6, using 40mm HBG metal, including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification | 32 | M3 | 5,300 ₹1.7 L | 7,500 ₹2.4 L |
| 7.00 | Finishing the concrete road with Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement. | 16 | M3 | 10,000 ₹1.6 L | 11,000 ₹1.8 L |
| 8.00 | Providing expansion joint for road concrete at same intervals of 5 m in both direction using prevalid aspheltics pad 15 mm thick to full width and plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification | 42 | M | 200 ₹8,400 | 100 ₹4,200 |
| 9.00 | Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal with form work for cover slab including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. (But excluding cost of steel reinforcement.) | 5 | M3 | 9,000 ₹45,000 | 11,000 ₹55,000 |
| 10.00 | Providing steel reinforcement MS/RTS rods upto16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete. | 630 | Kg | 70 ₹44,100 | 85 ₹53,550 |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
28 Jan 2026, 2:00 pmClosed
SE GCC CBE
OFFICE OF SE GCC COIMBATORE TATABAD COIMBATORE
Construction of cable duct and road works for enhancement of 110 33Kv bay at the existing Mudalipalayam 110 33KV SS in TIRUPPUR EDC
2026_EB_644077_1
ETS No. 56/25-26 of SE GCC Cbe
Open Tender
Civil Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,000
Yes
12 May 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard Specification as directed by the Engineer at site.
Earth work excavating for foundation in depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting as per standard Specification as directed by the Engineer at site.
Earth work excavation for Foundation in Hard rock by Wedging and Chiseling and trimming to proper shape where blasting is prohibited and stacking for measurements including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site.
Filling the foundation and floor with M Sand including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal, including cost of cement, all materials, labour charges including solidation, curing, all leads, lifts, as per standard specification etc., complete.
Providing concrete road with P.C.C. 1:3:6, using 40mm HBG metal, including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification
Finishing the concrete road with Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Providing expansion joint for road concrete at same intervals of 5 m in both direction using prevalid aspheltics pad 15 mm thick to full width and plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal with form work for cover slab including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. (But excluding cost of steel reinforcement.)
Providing steel reinforcement MS/RTS rods upto16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Supplying & Fixing of GI angle 45x45x6mm required length keeping in required alignment and level in yard cable duct fixing at 600mm C/c including all labour, lead, lift etc., complete.
Labour charges for Transporting of all cable duct cover slab from curing to duct keeping them alignment and fixing them in position including lead, lift, labour etc., complete.
Brick work in C.M 1:5 using chamber burnt class II bricks, for Breaker approach steps & Cable duct including, cost of cement, all materials, labour, curing, all leads and lifts, etc complete as per Standard Specification.
Plastering with CM 1:3, 12mm thick, including cost of cement, labour, curing, all leads and lifts as per standard specification, etc., complete.
Colour washing with two coats using ready mixed Weather Proof Exterior Emulsion (First quality - Apex or its equivalent) of approved quality and colour over a coat of exterior emulsion water based primer for Plinth exterior surfaces including through scrapping, clan removal of dirt, cost of all materials, scaffolding, Labour, Lead, Lift etc., complete and including necessary crack filling paste, putty whereever required.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
56S.pdf
Tender Documents • 0.61 MB
BOQ_771741.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid