| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹161.8 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹163.2 Cr+₹1.4 Cr (0.85%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹176.0 Cr+₹14.2 Cr (8.79%)Rejected-Finance 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | L3 | Rejected-Finance L2 | |
| 4 | L4₹182.2 Cr+₹20.4 Cr (12.6%)Rejected-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L4 | Rejected-Finance L4 |
Tender Value
₹155.8 Cr
EMD Value
₹77.9 L
Closing Date
22 Mar 2024, 6:15 pmClosed
Executive Engineer, Building Construction Division
Office of the Executive Engineer, Building Construction Division, ESIS Hospital Compound, Mulund, (West), Mumbai - 400080
Construction of Bharatratna Lata Dinanath Mangeshkar International Collage of Music and Museum at CTS 4094/1, Kalina, Santacruz, Mumbai (Including Civil and Electrical Works)
2024_PWR_1007871_1
NIT_NO_12_FOR_2023_24
Open Tender
Civil Works
Item Rate
1278 days
Kalina, Santacruz, Mumbai
As Per Tender Documents
3 documents required · 3 mandatory
₹5,900
₹77.9 L
Chief Engineer, Mumbai (P.W.) Region, Mumbai
3 Dec 2024
16 Feb 2024
26 Mar 2024
16 Feb 2024
22 Mar 2024
16 Feb 2024
16 Feb 2024 - 6 Mar 2024
6 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,
including removing the excavated material upto a distance of 50 metres beyond the
building area and stacking and spreading as directed, dewatering, preparing the bed
for the foundation and necessary back filling, ramming, watering including shoring and
strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means Ref: SSR 22-23,Item No :21.04,Sr No : 723 | - | - | - | - |
| 2 | Plot Development | 12,957.59 | CuM | 107 | ₹13,86,462.13 |
| 3 | a) Upto 1.50m lift Normal Rate | - | - | - | - |
| 4 | Basement & Ramp A | 2,089.02 | CuM | 107 | ₹2,23,525.14 |
| 5 | Basement & Ramp B | 129 | CUM | 107 | ₹13,803 |
| 6 | COMPOUND WALL | 653 | CUM | 107 | ₹69,871 |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations
including removing the excavated material upto a distance of 50 metres beyond the
building area and stacking as directed, including dewatering, preparing the bed for the
foundation and necessary back filling with available earth /murum, ramming, watering
including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means..SSR 22-23,Sr,No : 731,Item No : 21.16 | - | - | - | - |
| 8 | b) 1.50m to 3.00m lift, Add 10% | - | - | - | - |
| 9 | Basement & Ramp A | 5,222.56 | CuM | 107 | ₹5,58,813.92 |
| 10 | Basement & Ramp B | 322.51 | CuM | 107 | ₹34,508.57 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1762688.xls
BOQ • 0.89 MB
139755874.pdf
Tender Documents • 0.79 MB
139755885.html
Tender Documents • 0.03 MB
Drawings.rar
Tender Documents • 23.05 MB
E-12-1.pdf
Tender Documents • 5.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .