Tender Value
₹41.8 L
EMD Value
₹83,500
Closing Date
22 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
RATNAGIRI
6 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Exempted for Bid Security i) As per clause no 5 (ii) of GCC 2022, any firm recognized by Department of Industrial Promotion (DIPP) as Startup shall be exempted from payment of Bid Security. ii) As per clause no 5 (iii) of GCC 2022, Labour Co- Operative Societies shall submit only 50% of above Bid Security detailed above
Providing Barbed Wire Fencing at CRO Location under Sr.REN/Ratnagiri Section.
KR-RN-W-2026-09
KR-RN-W-2026-09
Open
Works - General
3 Months
Ratnagiri, Maharashtra
₹0
₹83,500
22 Apr 2026
2 Apr 2026
8 Apr 2026
12 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 41,23,189.26 | ||
| — | 15900.00 | — | — | ||
| 16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes up to 10mm dia etc complete | — | — | — | 17,61,353.66 | |
| — | 29000.00 | — | — | ||
| 16.18 Fencing with angle iron post placed at required distance embedded in cement concrete blocks every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires of barbed wire weighing 9.38 kg per 100 m (minimum) between the two posts fitted and fixed with G.I. staples, turn buckles etc complete (cost of posts, struts, earth work and concrete work to be paid seperately). Payment to be made per metre cost of total length of barbed wire used. 16.18.1 With GI Barbed Wire | — | — | — | 6,30,116.64 | |
| — | 222.00 | — | — | ||
| 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 4.1.5 1:3:6 (1 Cement : 3 Coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 16,81,170.23 | |
| — | 222.00 | — | — | ||
| 2.6 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth , 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m as directed by Engineer-in-charge. 2.6.1 All kinds of soil | — | — | — | 50,548.73 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BidSecurityFormat.pdf
ATTACHMENT
Barbed Wire fencing drawing
ATTACHMENT
n-09.pdf
ATTACHMENT
n-09Drawing-BarbedWireFencing.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .