Loading…
Loading…
Tender Value
₹33.1 L
EMD Value
₹66,200
Closing Date
21 Aug 2026, 1:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
NIT
14 conditions · 3 needing a document upload
Tenderers are advised to upload their financial capacity and capability.
ELECTRICAL CONTRACTORS LICENSE:- The contractor shall fulfill valid Electrical Contractor License requirement as per IE Rule 1956 clause no- 45. Electrical Contractors license shall be submitted along with the offer, failing which the offer will summarily be rejected.
Tenderers are advised to upload their past performance.
19 conditions · 5 needing a document upload
All the supporting DOCUMENT(S)/CERTIFICATE(S) of as a proof Technical and Financial credentials as detailed in this tender Document, has/have been attached.
Supporting DOCUMENTS/CERTIFICATES as detailed in this Tender Document has been attached.
The Bid Security shall be deposited either in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period. The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids. (i.e. excluding the last date of submission of bids.) (See clause 1.10 of Chapter-I of Tender Document)
All the bidders / tenders should ensure that they are GST compliant and their quoted tax structure / rates are as per GST Law. (Copy of GST registration certificate)
Copy of PAN CARD
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Repair, monitoring and maintenance of forced air ventilation and monitoring system in Tunnel No. 49 Down (25 C) in KJT-LNL section of Mumbai Division for a period of two years.
BB-LG-W-LNL-2026-02
BB-LG-W-LNL-2026-02
Open
Works - General
24 Months
Mumbai, Maharashtra
₹0
₹66,200
21 Aug 2026
30 Jul 2026
7 Aug 2026
11 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 33,09,074.3 | ||
| — | 24.00 | — | — | ||
| Repairs of forced air ventilation and monitoring system in tunnel no. 49 in KJT-LNL section | — | — | — | 25,95,678.72 | |
| — | 24.00 | — | — | ||
| Cost of consumables & spares | — | — | — | 4,09,657.92 | |
| — | 1.00 | — | — | ||
| Repairs of 22 kW jet fan for forced air ventilation in Tunnel No. 49 Down (25 C) in KJT- LNL section including(a) Lowering of Jet fans from the location by taking traffic and power block, making temporary tower fixture and mechanised chain pulley arrangement along with specialised tools and tackles with all safety precautions; dismantling and shifting of Jet fans from location to outside with suitable mechanism; transportation; repairing / overhauling and replacement of D end and ND end bearings of motor; testing of motors (electrical and mechanical) including insulation testing, temperature rise, noise level, vibration etc. Shifting and assembling of Jet Fans; re-erection of the fans as per procedures; testing of fans and complete assembly for direction, starting current, running current etc. at site; dismantling of faulty impeller and replacing with newly fabricated impeller consisting of 10 blades set with proper angular alignment, machining, fixing in grooves of drum and testing; dynamic balancing of fan after replacing the impeller along with mechanical/ electrical testing.(b) Replacement of AVM (04 Nos in one fan) and alignment of jet fans; replacement of safety chains with suitable clamps, D shackles and hardware; safety audit of all anchored bolts including physical inspection and load testing with minimum four times the load and issuing of safety audit certificate. | — | — | — | 2,33,957.5 | |
| for details. | Breakup | — | — | ||
| Replacement of 22kV 3 phase AB switch 200A cap. along with GOD operating switch assembly inclusive insulator& flexible jumper | — | — | — | 38,878.12 | |
| — | 6.00 | — | — | ||
| Concrete Muffing (M-40 grade) from 0.5 below to 0.5 m above ground (cum = Cubic- mtr) | — | — | — | 30,902.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC April 2022
ATTACHMENT
Checklist.pdf
ATTACHMENT
TenderBookof49Tunnel_1.pdf Tender Document
ATTACHMENT
TenderBookof49Tunnel_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .