Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-Finance L1 for item no.02 | |
| 2 | L1₹1.8 LAccepted-Finance 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | L1 | Accepted-Finance L1 | |
| 3 | L2₹1.8 L+₹4,500 (2.51%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 4 | L3₹2.3 L+₹53,400 (29.7%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L3 | Accepted-Finance L3 | |
| 5 | L4₹2.4 L+₹55,500 (30.9%)Accepted-Finance BHAGWATI NAGAR JAMMU | L4 | Accepted-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
9 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Mechanical Division RTIC Kathua
Executive Engineer Mechanical Division RTIC Kathua
Strengthening of M.S Rising Mains of 900mm diameter by replacement of part of length along with allied works unit No 01and 02 at Lift Station Lakhanpur and Reconditioning of 01 no. 450 H.P 6.6 KV 3 phase Slip ring type BHEL Make H.T. Motor
2023_IFC_240797_1
e-NIT No.44 of 2023-24 dt. 20.12.2023
Open Tender
Pumps/Motors
Turn-key
30 days
Lakhanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Mechanical Division RTIC Kathua
₹10,500
Yes
Executive Engineer Mechanical Division RTIC Kathua
1 Feb 2024
20 Dec 2023
10 Jan 2024
20 Dec 2023
9 Jan 2024
26 Dec 2023
22 Dec 2023
Amount
Strengthening of M.S Rising Mains of 900mm diameter by replacement of part of length along with allied works (unit No 01and 02) at Lift Station Lakhanpur(As per scope of work Annexure C item no.01) Strengthening of M.S Rising Mains of 900 mm diameter of unit No. 01 and 02 both at leaked/ weak joints by way of cleaning the area to make path up to the destination and around the site of work by uprooting grass, bushes, rank, vegetation, and earthwork in excavation around and below 900 mm diameter M.S pipe with the help of JCB wherever required in order to facilitate welding work along and periphery of the pipe. The job includes hiring and carriage of DG set, gas cutting cylinder etc. Erecting proper scaffolding arrangement below both the pipe and then cutting the weak/damaged portion of pipe of approximately 10 feet length each from both the pipes by using grinder, gas cutter and other tools and tackles alongwith dismantling both the pipe from concrete structure by way of breaking the concrete support structure of the pipe. The damaged portion of pipe is then removed by way of lifting it withthe help of hydra crane to the suitable location. New pipes of length 20 feet ( 2x10 feet each) then carried to both the location using chain pulley block, hydra crane and scaffolding in such a way it gets properly aligned with the rest portion of the rising mains.Making V- groove by using grinder, gas cutter on both the side of the new pipe and around the circumference of the rising mains and then welding three layers of flux around the periphery of 900 mm diameter M.S. pipe by skilled worker in such a way the new pipe gets properly welded to the rising mains and proper leak proof joint is made by using superior quality welding electrodes free from spurt/gap removing un-wanted deposits and finishing etc. Restoring the concrete support structure of both the pipe in such a way the new portion of pipe gets properly fixed and supported by concrete structure removing the scaffolding arrangement from the pipe. Anti corrosive treatment to the new portion of both the pipe is to be provided by way of scratching surfaces of pipes with wire brush, emery paper to make surface smooth and ready for application of paint. Painting both the new portion of pipe by applying two coats of red oxide and then two coats of super enamel. Complete job includes cost of material, labour charges, carriage and handling charges, transportation charges, crane charges, JCB charges and charges for all tools and tackles required for execution of job.
Reconditioning of 01 no. 450 H.P; 6.6 KV; 3-phase; Slip ring type ( BHEL-Make) H.T. Motor unit No 03 installed at lift irrigation station, Lakhanpur(As per scope of work Annexure C item no. 02) Reconditioning of 01 no. 450 H.P; 6.6 KV; 3-phase; Slip ring type ( BHEL-Make) H.T. Motor of unit No 03 by way of disengaging all of its three phase cables, connections of rotor, stator and then de-coupling it from the pump and base frame. Carriage of motor from the Lakhanpur pump house to workshop of the firm in Mechanical transport by deploying crane/suitable chain-pulley arrangement. Complete dismantling of motor, which includes extraction of rotor out of damaged stator and also extraction of old damaged bearings from the rotor shaft and other allied parts. Opening, checking of coil/ strip connections of ends of stator and removing of its insulation for tracing out the faulty/ defective/ flashed coils, removing of anti-vibration packing stuff and block extraction of flashed strips carefully to save the damages of related strips, testing and checking the coils with testing equipment. De-soldering the stator coils in order to make defective/flashed coil of approximately 10 Nos independent so that extraction of the same damaged coils can be done by heating with D.C. Magneto type welding set. The coils are to be extracted in such away that no further damage is caused to rest of the coils. Scrapping off old insulation material from all the grooves of damaged strips. Reconditioning of motor by way of Cleaning the grooves/ slots of the extracted damaged strips with recommended chemical cleaner. Providing and inserting the rewinding / new fabricated strips in the respective slots with new slot lines, new wedges and nomax paper complete with other required packing stuff and insulation material of “F” class. Insulation of pitch coils and insertion in their respective slots alongwith their new separate wedges, packing of anti-vibration blocks and locking the same with glass coils etc. Also extraction of overhangs, soldering the each joint, re-insulating all the joints with proper insulating material and replacement of loose/damaged wedges. Soldering all the new coil connections properly with rest of the coils of stator, insulating the connections of the stator coils and the connections connecting the stator winding to the stator cable leads. Joining the same with high class brazing material and clamps. Cleaning the complete stator with CRC-226. Reconditioning coils with Dr Beck varnish and drying out the stator under controlled temperature of 90 degree C max. Continuing the drying out process till the required IR value and PI value is achieved. Job includes providing and fitting of new bearing set i.e. bearing no NU-228M and 6228C at DE and bearing no NU224M at NDE of standard quality and greasing them properly. Re-assembling the motor after repairs and carriage of motor from the workshop to pump house, Lakhanpur. Placing the motor on the base frame and fitting it by making alignment with the pump, coupling the motor with the pump. Making all the electric connections. Testing the motor on full load. Complete job includes cost of material, labour charges, transportation cost, tools and tackles required for execution of work.
M/S FASTTRACK ENGINEERS
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS
M/S K S ENGG WORKS
M/S UK MECH AND ELECT ENGG WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .