| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹4.9 L+₹10,591 (0.82%)Accepted-AOC | L-2 | Accepted-AOC As per site requirement and tender terms and conditions | |
| 3 | L-3₹14.1 L+₹1.2 L (9.10%)Rejected-Finance 18 309 LAL MANI DEVI MARG AGRAWAL NAGAR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
2 Jan 2021, 6:00 pmClosed
Superintending Engineer O and MC-II,3X200MW,BTPS
Office of Superintending Engineer O and MC-II,3X200MW,BTPS
Annual breakdown / running maintenance of H.P. Valve, L.P. Heater, Gland Steam Cooler and EOT Crane and etc. work of unit no. 9, 10,11,12, and 13 of 5X200 MW, BTPS, Obra
2020_RVUNL_524551_1
T-17/SE-II/BTPS/TMD-I/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Unit no. 9, 10, 11, 12 and 13 of 5X200MW, BTPS, Obra
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy. Chief Account Officer, CFA and BO, BTPS, Obra
₹25,000
31 Mar 2021
24 Oct 2020
6 Jan 2021
24 Oct 2020
2 Jan 2021
24 Oct 2020
24 Oct 2020 - 2 Jan 2021
Amount
Overhauling of special valve.
Main steam valve i.e. V2-6 (L&R)
Extraction Motorized valve i.e. ES-3,4,5,6, & 7
Feed line valve with their by pass valve i.e. V2-81-A, V2-81-B, V2-81-C and V2-82, V2-83, V2-84
Drip line gate valve i.e. HD-21, HD-29, HD-30, HD-31
NRV of extraction line, ES-1/ES-2
NRV of extraction line, ES-8/ES-11
Motorized valve connected to condenser, i.e. DW-4, 38 to 41 & CA-5
AS-47 and AS-48 valve.
CST Makeup valve.
Forced closing non-return valve LPH-3&4 and steam isolating valve of LPH-3 & 4.
Condensate water throw off valve to condenser (L&R)
Steam throw off valve to condenser(L&R) and steam isolating valve of LPH-2
Steam by pass valve i.e. V2-27, V2-15, & V2-7
Cutting & Replacement of special valve by H.P welding technique
V2-27 & V2-15 valve.
ES-9 valve.
V2-38, V2-81, V2-82, V2-83, V2-84 valve size-250 mm.
Overhauling of actuators of valve.
Main steam line stop valve, MSV-L&R
Extraction of drip line valve, ES-3 to ES-7, HD-21, HD-29 to HD-31
Valve connected to condenser i.e. DW-4, DW-37 to DW-41and CA-5.
AS-47 to AS-48 valve actuator
Butterfly valve actuator.
CST makeup valve actuator.
Actuator of steam throw off valve for condenser (L&R), discharge valve of BFP-A, B &C & HPH by pass and isolating feed valve, MSV by pass valve i.e. V2-27, V2-15, V2-7 valve actuator.
Actuator of steam isolating valve to LPH-3 to LPH-5
Blanking of CRH line flange for H.T. of re-heater and normalizing their after hydraulic test of re-heater.
Overhauling and Re-visioning of LPH-2 to LPH-4
Re-visioning of GC-I, GC-II and attending the flange leakage.
Tightening of flange of CRH and GC-I, GC-II, LPH during running.
Overhauling of LPH-1A, LPH-1B
Overhauling of gauge glass of LPH, GC-I, GC-II, Condenser Main ejector and deaerator.
Removal chocking oil tray drain of bearing no.-1 & 2 of main turbine.
Removal of chocking of drain system of centrifuging machine.
Overhauling of HP/LP by pass valve:
Overhauling of HP by pass valve.
Overhauling of LP by pass valve.
Overhauling of HP/LP by pass spray valve.
Replacement of damaged NRV by repaired/ new NRV of PCV-14 PCV-17 Size-200mm.
Replacement of damaged NRV by repaired/ new NRV of feed line by H.P. welding technique (Size-250mm, Pr.-200Kg/Cm2)
Overhauling of DSS of Aux., PRDS-II
Overhauling of L.P. NRV.
Overhauling of different flash tank.
Main flash tank.
Aux. flash tank.
Repair/replacement of broken hanger.
Tightening of loose hangers.
Overhauling of butterfly valve of condenser inlet/outlet in position.
To attend the flange leakage of CRH Line.
Hot tightening of cross over pipe and application of liquid glass and asbestos.
Hot tightening of ejector during running to stop the flange leakage.
Patch welding work in the condenser and L.P. Zone in condenser.
Chit Ram Crane (Capacity-120/25 Ton) Garlic Crane-75/10 Ton.
Servicing of all the gear boxes of LT/CT Trolley Aux. hook and main hook
Servicing of hydraulic brake system CT/LT trolley and Aux. hook including the changing of brake lining of all the four brakes system for which workshop facility will be provided by the department.
Servicing of greep brake system of LT/CT Trolley Aux. hook and main hook which includes the changing of the brake line.
Servicing of all the wheel of CT/LT Trolley and checking of their fish plate.
Checking and greasing in all the bearing of long travel shaft and cross travel shaft and checking & greasing of all the gear coupling of above shaft and changing of rubber bush coupling bolt of motor and shaft.
Complete O/H of small hook system of chit Ram/ Garlic Crane in T.G. hall.
Complete O/H of main hook.
Checking cleaning of wire rope drum their bearing & application of cradium compound in the wire rope.
M/s Varghese Contractor
KIRAN CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .