Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.3 L+₹2.9 L (6.79%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAVISHANKAR.P L1 | Sri Sanjana Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Annanager to Pandian kottai km 0/0 - 0/960 H/o Bommahalli, R - 224 | |||||
| 2.00 | Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete | 1,382.4 | Sqm | 6 ₹8,294.4 Lowest | 7 ₹9,676.8 |
| 3.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A | |||||
| 4.00 | Km 0/0-0/960 | 172.8 | Cum | 131 ₹22,636.8 Lowest | 145 ₹25,056 |
| 5.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS | |||||
| 6.00 | Km 0/0-0/960 | 57.6 | Cum | 505 ₹29,088 Lowest | 550 ₹31,680 |
| 7.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sqm | 960 | Sqm | 21 ₹20,160 Lowest | 35 ₹33,600 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0-0/960 | 432 | Cum | 2,104 ₹9,08,928 Lowest | 2,250 ₹9,72,000 |
| 10.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg of Bituminous Emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | |||||
Tender Value
₹52.4 L
EMD Value
₹53,000
Closing Date
16 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Addl. Collector (Dev) / Project Director, DRDA
DRDA, Dharmapuri
1.Strengthening of the road fromAnnanager to Pandian kottai km 0/0 - 0/960 H/o Bommahalli, 2.Strengthening of the road fromMM Road to Alamarathupatty BG Road km 0/0-0/570 H/o Bommahalli
2025_RDTN_553377_1
Roc.No.736/2025/R2 MGSMT P39
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹53,000
DRDA, Dharmapuri
28 Sept 2025
1 May 2025
16 May 2025
1 May 2025
16 May 2025
7 May 2025
7 May 2025
Amount
Strengthening of the road from Annanager to Pandian kottai km 0/0 - 0/960 H/o Bommahalli, R - 224
Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sqm
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg of Bituminous Emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and lyaing TACK COAT ove the WMM surface (treated with primer) using 2.50 KG of Bituminous Emulsion RS1 for 10 sqm. including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Providing rumble strips covered with premix bituminuous carpet 15-20 mm at centre and 250mm wide placed at 1m intervals centre to centre at approved locations to control speed marked with white strips of road marking paint.Rumble strips 3x3.75x0.25
Provision for Hectometer Stone
Provision for Name Board
Provision for Sign Board
Strengthening of the road from MM Road to Alamarathupatty BG Road km 0/0-0/570 H/o Bommahalli, R - 611
Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sqm
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg of Bituminous Emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and lyaing TACK COAT ove the WMM surface (treated with primer) using 2.50 KG of Bituminous Emulsion RS1 for 10 sqm. including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Providing rumble strips covered with premix bituminuous carpet 15-20 mm at centre and 250mm wide placed at 1m intervals centre to centre at approved locations to control speed marked with white strips of road marking paint.Rumble strips 3x3.75x0.25
Provision for Sign Board
Provision for Hectometer Stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Sanjana Constructions (BID ID -1338999)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .