| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 LRejected-AOC | ₹5.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Dhuruvan Infrastructure | Jayaseelan Contractor |
|---|---|---|---|---|---|
| 1.00 | De-silting the silts in the open drain in slushy soil with wet type, including bailing of water removing slushy soil by manually. The removed soil silts after dried loading by a motor vehicle in and around 3 Km. radius and unloading in low lying area. | 22 | Cum | 3,190 ₹3,764.20 | 3,036 ₹3,582.48 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers | 8 | Cum | 45,600 ₹53,808 | 45,520 ₹53,713.60 |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 212 | Sqm | 80,560 ₹95,060.80 | 71,020 ₹83,803.60 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 17 | Cum | 1,15,600 ₹1.4 L | 1,15,175 ₹1.4 L |
| 5.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 235 | Sqm | 3,17,250 ₹3.7 L | 3,05,500 ₹3.6 L |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
25 Feb 2026, 3:00 pmClosed
The Commissioner
New Colony 3rd Main Road,Chrompet
TCMC - Raising of Drain Side Wall and Providing Precast slab at Valluvar Pettai 1st, 2nd ,3rd Street in Ward No.13 Tambaram City Municipal Corporation Zone II
2026_DMA_662192_1
171/2025/E1 Z2
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation Zone II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
28 Apr 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
De-silting the silts in the open drain in slushy soil with wet type, including bailing of water removing slushy soil by manually. The removed soil silts after dried loading by a motor vehicle in and around 3 Km. radius and unloading in low lying area.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_794973.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid