Construction Of Remaining Perpheral Road and Drain and Cross Drain beside Godwon at Fatuha.
125888
ED-24/2025-26
Open Tender
CIVIL
Patna
• Name of the tenderer
• Permanent Address
• Present Address
• Aadhar No.
• Pan No.
• GST No.
• Contact No..
• Registration No. & Department
• Email id
CIVIL
PERCENTAGE
L1
1
17 documents required · 17 mandatory
₹11,800
Processing Fee: 3540
₹2.6 L
Conference Hall, Head Office , BSWC, Patna
13 Apr 2026
23 Feb 2026
10 Mar 2026
24 Feb 2026
9 Mar 2026
24 Feb 2026
27 Feb 2026
TECHNICAL BID EVALUATION SHEET
Bihar State Warehousing Corporation
B-2, 1st Floor Mauryalok Complex, Patna-800001
COLORED CELLS TO BE FILLED IN BY CONTRACTOR
Name of Work:- Construction Of Remaining Perpheral Road and Drain and Cross Drain beside Godwon at Fatuha.
BOQ Amount:- 13198150
FULL MARKS BIDDER
SL. NO. PARTICULARS LAID DOWN CRITERIA AS PER NIT CONDITION EVALUATION CRITERIA PAGE
A Name and address of agency
B Registration no. & department Agency must be registered with Govt./State Govt./Undertakings Mandatory Agency must be registered otherwise bid will be rejected
C GST Must possess GST registration Mandatory ---do------
D PAN CARD Must quote PAN No. Mandatory ---do--
E Earnest Money In the form as specified in N.I.T and required amount. Mandatory ---do------
F Character Certificate Must posses Character Certificate Mandatory ---do--
Note:-The bidders should necessarily be responsive on above mentioned six counts A to F. The bidders found Non- responsive in any one of the above mentioned six counts will not be considered for further markings & their Bid will be rejected.
MARKING DETAILS
SL. NO. PARTICULARS LAID DOWN CRITERIA AS PER NIT CONDITION EVALUATION CRITERIA BIDDER
FULL MARKS Desired distribution PAGE
1 Average annual financial turn over of last three years (AATO may be indexed as per norms of bidding documents) Submit A.T.O of Chartered account ant for last three years 30 i) AATO equal to or above BOQ amount-----30
ii) AATO equal to or above 70%of BOQ amount-----20
iii) AATO equal to or above 50% but below 70% of BOQ amount----- 15
iv) AATO equal to or above 40% but below 50% of BOQ amount-------10
v) AATO equal to or above 25% but below 40% of BOQ amount-----5
vi) AATO below 25% of BOQ amount-----Nil
Average A.T.O.after indexation
2 Experience of doing work of similar nature in last three years. Must submit details of work done duly certified by the concerned E.E 20 i)If executed single work of similar nature equal to 50% of BOQ amount---20
ii)If executed single work of similar nature equal to 40% of BOQ Amount ---15
iii)If executed single work of similar nature equal to 25% of BOQ Amount ---10
iv)If executed single work of similar nature below 25% of BOQ Amount- ---nil
3 Details of Engineering setup for successful completion of work Must submit details Engg. Setup with individual affidavit of engineers. 10 i) Engg.setup with one-Deg.holder + one Diploma holder + suff.. staff--10
ii) Engg. setup with 1-Deg.holder/one Diplomaholder + suff. staff--5
4 Plant and equipment for successful completion of work i)Atomaticbatching plant with all equipment. (ii)Conc.mixer with weighing facility. (iii)Steel shuttering & centering more than 2000sft. (iv)Vibrator & water tanker. 10 i)Automatic Batching plant with all equipment---10
(ii) Concrete mixer with weighing facility---04
(iii)Steel shuttering and centering more than 2000sft--04
(iv)water tanker ………...01
5 Details of financial availability through bank or self Bank certificate of extending credit facility up to 10% of BOQ amount 10 i) credit facility certificate given by Indian Bank upto 10%of BOQ amount ----05
(ii) Self declaration -----05
6 Necessary undertakings Agency should furnish the following undertakings. (i)Not abandoned project. (ii)No litigation. (iii)No relation. 5 (i) Not abandoned any project--03
(ii) No litigation--01
(iii) No relation---01
(iv) Not submitted any certificate--- 00
7 Bidding capacity BC = AxNx2-B. A=Max .ATO after index ation. B=value of work in hands (Existingcommitment) N=Time of completion in years. Attach bidding statements with details 10 i) BC more than or equal to BOQ amount--10
iI)BC more than or equal to 70%but below BOQ amount--5
iIi)BC more than or equal to 50%but below 70% of BOQ amount--3
iv)BC below 50% of BOQ amount---nil
8 Timely completion of project in last three years. Attach certificate of the concern E.E 5 i)If three or more than three projects executed in stipulated time during last three year--05
ii)If less than three projects executed in stipulated time during last three year--03
iii)If no projects executed in stipulated time during last three year--00
Note:- (i) )Minimum qualifying marks = 50/100 for project between 50lakhs to 200 lakhs
BIHAR STATE WAREHOUSING CORPORATION
B-2, 1st Floor Mauryalok Complex, Patna-800001
Name of Work :- Construction Of Remaining Perpheral Road and Drain and Cross Drain beside Godwon at Fatuha.
BILL OF QUANTITY
Cost of BOQ : Rs. 10,000.00 with 18% GST, Beltron Processs Fee : As per eproc 2 (Non Refundable)
Amount of BOQ : Rs. 1,31,98,150.00 Amount of EMD : Rs. 2,63,963.00
Sl. No. SOR NO. Item of Work Unit Quantity Rate
1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All Kinds of soil M3 0.400 360.7 Rupees Three Hundred Sixty Paise Seventy Only
2 2.28 Supplying and filling in plinth with local sand and under floors including watering, ramming consolidating and dressing complete. M3 0.000 287.3 Rupees Two Hundred EightySeven Paise Thirty Only
3 Providing designation 100 A one Brick Soling joints filled with local sand including cost of watering, taxes, royalty, all complete as per Building Specification and direction of E/I. M3 0.000 283.3 Rupees Two Hundred EightyThree Paise Thirty Only
4 4.1 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.
4.1.3 1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size) M3 0.000 3998.1 Rupees Three Thousand Nine Hundred NinetyEight Paise Ten Only
5 6.1A Brick work with bricks of class designation 100A in foundations and plinth in:
6.1.12/1 Cement mortar 1:4 (1 cement : 4 coarse sand) M3 0.999 Rupees Five Thousand Seventeen Paise Ninety Only
6 12 mm cement plaster of mix:
13.11.1 1:3 (1 cement : 3 coarse sand) M2 391.62 Rupees One Hundred SixtyFour Paise Thirty Only
7 Neat cement punning M2 391.62 Rupees Fourty Paise Fifty Only
8 Reinforced cement conrete work in beams,suspended floors, roofs having slope upto 15, landings,balconiec, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excludingthe cost of centring, shuttering, finishing and reinforement with 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size). M3 12.42 Rupees Five Thousand Three Hundred ThirtyFive Paise Ninety Only
9 5.33.B Add or deduct for providing richer or leaner mixes respectively at all flow lebles
5.33.B4 Providing M-15 grade RCC instead of M-20 grade RCC M3 12.42 Rupees Three Hundred EightyThree Paise Eighty Only
10 Centring and shuttering including strutting,propping etc. and removal of form for.
5.9.1 Foundations, footings, bases of columns etc. for mass concrete. M2 88.26 Rupees Two Hundred Eleven Paise Sixty Only
11 5.9.3 Suspended floors, roots, landings, balcnies and access platform. M2 #,##0.999 437.5 Rupees Four Hundred ThirtySeven Paise Fifty Only
12 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia. KG #,##0.199 90.8 Rupees Ninety Paise Eighty Only
5.22.7D Thermo-Mechanically Treated bars TMT Fe-500-I6mrn dia. KG #,##0.600 91.7 Rupees NinetyOne Paise Seventy Only
13 Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. KL 1323.075 Rupees One Hundred Seven Paise Twenty Only
14 Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. %Sft 3526.25 Rupees Three Hundred FiftySeven Paise Twenty Only
15 2.2 Earth work in rough excavation , banking excavated earth in layer not exceeding 20 cm in depth , breaking clods watering , rolling each layer with 1/2 tonne roller or wooden or steel rammers and rolling every 3rd and topmost layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks , marginal banks and guide banks or filling up ground depressions. lead upto 50 m and lift upto 1.5 m.
2.2.1 All Kinds of soil M3 0.200 386.6 Rupees Three Hundred EightySix Paise Sixty Only
16 4.01B (V) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. M3 0.999 Rupees One Thousand Three Hundred Four Paise Sixty Only
17 4.11 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
4.11.B .ii (a) Using Screening Crushable type such as Moorum or Gravel. M3 387.525 Rupees One Thousand Nine Hundred Thirty Paise Sixty Only
18 16.42 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. M3 816.395 Rupees Four Thousand Six Hundred FourtyNine Only
19 5.33B Add or deduct for providing richer or leaner mixes respectively at all floor levels.
5.33B.4 Providing M-15grade R.C.C instead of M-20 grade R.C.C. M3 816.395 Rupees Three Hundred EightyThree Paise Eighty Only
20 Carriage of Materials
Bricks %0 Nos. 34800 Rupees One Thousand One Hundred Nine Paise Three Only
Stone Chips M3 0.376 Rupees One Thousand Three Hundred EightyNine Paise FourtyFive Only
Coarse Sand M3 0.087 Rupees One Thousand Five Hundred FiftyEight Paise FiftyNine Only
G.S.B. & W.B.M Material (Stone metal) M3 0.825 Rupees One Thousand Four Hundred FourtyNine Paise SeventyNine Only
4.75 mm below screening material M3 0.539 Rupees One Thousand Two Hundred SeventyFive Paise FiftyFive Only
Moorum M3 0.527 Rupees One Thousand Three Hundred EightySix Paise TwentyNine Only
Earth M3 0.200 Rupees Three Hundred Fourteen Paise TwentyOne Only
Fine Sand M3 0.480 Rupees Three Hundred Ten Paise FourtySeven Only
Additional Cost Of Bricks %0 Nos. 34800 Rupees Two Hundred Seventy Paise FiftyEight Only
Additional Cost Of Cement MT 0.583 Rupees Two Hundred SixtyTwo Paise SeventyEight Only
Add difference of GST 5.36% as per BCD SOR, dt. 01.01.2022
Bricks %ones. 34800 Rupees Five Thousand Five Hundred Only
Stone metal (53 mm to 26.5 mm) M3 0.060 328.11 Rupees Three Hundred TwentyEight Paise Eleven Only
Stone metal (26.5 mm to 9.5 mm) M3 0.421 477.36 Rupees Four Hundred SeventySeven Paise ThirtySix Only
Stone metal (9.5 mm to 4.75 mm) M3 0.343 Rupees Four Hundred Six Paise FourtyFive Only
4.75 mm below Screening material (stone dust) M3 0.539 87.3 Rupees EightySeven Paise Thirty Only
Screening material (Moorum) M3 0.527 Rupees SeventyFive Paise ThirtyFive Only
Earth M3 0.200 Rupees SixtySix Paise EightyFive Only
Local sand M3 0.480 Rupees SixtySix Paise EightyFive Only
Stone Chips (20 mm) M3 0.376 445.36 Rupees Four Hundred FourtyFive Paise ThirtySix Only
Coarse sand M3 0.087 25.8 Rupees TwentyFive Paise Eighty Only
10% of Siegnorage
Bihar State Warehousing Corporation
B-2, 1st Floor Mauryalok Complex, Patna-800001
FINANCIAL BID FORM
COLORED CELLS TO BE FILLED IN BY CONTRACTOR
Name Of Work Construction Of Remaining Perpheral Road and Drain and Cross Drain beside Godwon at Fatuha.
Amount of BOQ in Rs. 13198150
a If a bidder is willing to execute the works, say at the BOQ Amount, he/she must fill in "0" in front of 'in figures' and "ZERO" in front of 'in words' and "AT THE BOQ AMOUNT" in front of 'Above or below'
b If a bidder is willing to execute the works, say at 2.45 percent below the BOQ Amount he/she must fill in "2.45" in front of 'in figures' and TWO POINT FOUR FIVE" in front of 'in words' and "BELOW" in front of 'Above or below'
SI No. What to fill in the colour cells Fill in the four coloured cells below
1 Name of Contractor
2 Address of Contractor
3 Contact Phone No. Contractor
4 Percent above or below the BOQ Amount In figure
5 Above or below
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NITSBDED24202526.pdf
NIT • 0.47 MB
NITSBDED24202526.pdf
NIT • 0.47 MB
01Technical Bid Form...........xls
NIT • 0.03 MB
01Financial Bid Form.xls
NIT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .