Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC Contract Awarded |
| 2 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC Contract Awarded |
| 3 | L1₹2.4 CrRejected-AOC | ₹2.4 Cr | L1 | Rejected-AOC Contract not Awarded |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
7 Jan 2021, 2:00 pmClosed
Director, Soil Conservation Deptt.
Directorate of Soil Conservation Deptt., Assam, Ghy-05
DAIMABARI WATER HARVESTING AND EROSION PROTECTION PROJECT UNDER BAKSA DISTRICT UNDER RIDF-XXV, 2019-20
2020_SCD_19768_1
E-TEN-1/2020-21/3905 Date.-21/12/2020
Open Tender
Civil Works
Works
1095 days
Baksa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹5.0 L
Yes
1 Mar 2021
24 Dec 2020
7 Jan 2021
24 Dec 2020
7 Jan 2021
28 Dec 2020
Amount
CONSTRUCTION OF R.C.C. CHECK DAM AT No.1 KUSUMJULI VILLAGE (PART-A)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification.
Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications.
Providing & laying filter media as specified
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
Construction of peripheri bund with appproved material as specifed.
Providing turfing as specified.
Providing and laying boulder apron
Providing weep hole
Foot bridge
Reinforcement cement concrete works
Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification.
Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications.
Earthwork in excavation of diversion channel
Earthwork in filling of diversion channel
Temporary Camp Hut
Instalation of Tube well
CONSTRUCTION OF R.C.C. CHECK DAM AT No.1 KUSUMJULI VILLAGE (PART-B)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification.
Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications.
Providing & laying filter media as specified
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
Construction of peripheri bund with appproved material as specifed.
Providing turfing as specified.
Providing and laying boulder apron
Providing weep hole
Foot bridge
Reinforcement cement concrete works
Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification.
Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications.
Earthwork in excavation of diversion channel
Earthwork in filling of diversion channel
Temporary Camp Hut
Instalation of Tube well
CONSTRUCTION OF R.C.C. CHECK DAM AT No.1 KUSUMJULI VILLAGE (PART-C)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification.
Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications.
Providing & laying filter media as specified
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
Construction of peripheri bund with appproved material as specifed.
Providing turfing as specified.
Providing and laying boulder apron
Providing weep hole
Foot bridge
Reinforcement cement concrete works
Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification.
Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications.
Earthwork in excavation of diversion channel
Earthwork in filling of diversion channel
Temporary Camp Hut
Instalation of Tube well
CONSTRUCTION OF R.C.C. CHECK DAM AT No.1 KUSUMJULI VILLAGE (PART-D)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification.
Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications.
Providing & laying filter media as specified
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
Construction of peripheri bund with appproved material as specifed.
Providing turfing as specified.
Providing and laying boulder apron
Providing weep hole
Foot bridge
Reinforcement cement concrete works
Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification.
Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications.
Earthwork in excavation of diversion channel
Earthwork in filling of diversion channel
Temporary Camp Hut
Instalation of Tube well
CONSTRUCTION OF BOULDER REVETMENT WITH PITCHING AT MOTIGAON VILLAGE (PART-E)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Providing & laying boulder apron layed in wire crates as specified.
Providing & laying filter material underneath the boulder pitching in slopes as specified.
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
Embankment construction with materials obtained from borrow pit as directed and specified.
Temporary Camp Hut
CONSTRUCTION OF BOULDER REVETMENT WITH PITCHING AT MOTIGAON VILLAGE (PART-F)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Providing & laying boulder apron layed in wire crates as specified.
Providing & laying filter material underneath the boulder pitching in slopes as specified.
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
Embankment construction with materials obtained from borrow pit as directed and specified.
Temporary Camp Hut
CONSTRUCTION OF BOULDER REVETMENT WITH PITCHING AT MOTIGAON VILLAGE(PART-G)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Providing & laying boulder apron layed in wire crates as specified.
Providing & laying filter material underneath the boulder pitching in slopes as specified.
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
Embankment construction with materials obtained from borrow pit as directed and specified.
Temporary Camp Hut
CONSTRUCTION OF BOULDER REVETMENT WITH PITCHING AT MOTIGAON (PART-H)
Site preparation
Earth work in excavation of foundation of structure as per drawing and technical specification.
Providing & laying boulder apron layed in wire crates as specified.
Providing & laying filter material underneath the boulder pitching in slopes as specified.
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
Embankment construction with materials obtained from borrow pit as directed and specified.
Temporary Camp Hut
Sri Chandu Prakash Agarwala
DIGEN SWARGIWARY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .