Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.5 LAccepted-AOC 5 151 B DR SUBRAYAN NAGAR METTUR DAM SALEM 636 401 | SALEM | TAMIL NADU | 636401 | ₹26.5 L Quoted ₹23.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹25.1 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹25.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | PRABU ENGINEERING ENTERPRISES PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 400 | joints | 5,244 ₹21.0 L | 5,005 ₹20.0 L |
| 2.00 | Charges for fin welding : Charges for fin welding by cleaning, surface preparation and welding. | 75 | mtr. | 858 ₹64,350 | 819 ₹61,425 |
| 3.00 | ARC FILLING: Grinding of Boiler tubes for Arc filling of size 150 x 25 mm area for 3 Layers | 50 | Nos. | 3,875 ₹1.9 L | 3,699 ₹1.8 L |
| 4.00 | ARC FILLING Charges: IBR Welder for Arc filling of area 150 x 25 mm by 3 layer | 50 | Nos. | 1,681 ₹84,050 | 1,604 ₹80,200 |
| 5.00 | Supratherm special (E 7018) / chromotherm - 1 (E 8018) welding electrode 2.5 mm with material / manufacturer's test certificate | 2,800 | Nos. | 8 ₹22,400 | 7.6 ₹21,280 |
| 6.00 | Supratherm special welding electrode 3.15 mm (E 7018) with material / manufacturer's test certificate | 525 | Nos. | 11 ₹5,775 | 10 ₹5,250 |
| 7.00 | Cutting gas | 3.5 | set | 4,060 ₹14,210 | 3,876 ₹13,566 |
| 8.00 | Argon gas | 3.5 | set | 3,245 ₹11,357.50 | 3,098 ₹10,843 |
| 9.00 | T & Ps and consumables | 1 | LS | 14,300 ₹14,300 | 13,650 ₹13,650 |
Tender Value
Refer Docs
EMD Value
₹22,900
Closing Date
25 Nov 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
2025_EB_622163_1
CE / MTPS-I / SE / M-I / BM /OT. 337 / 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹22,900
Yes
18 May 2026
11 Nov 2025
26 Nov 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
Amount
Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
Charges for fin welding : Charges for fin welding by cleaning, surface preparation and welding.
ARC FILLING: Grinding of Boiler tubes for Arc filling of size 150 x 25 mm area for 3 Layers
ARC FILLING Charges: IBR Welder for Arc filling of area 150 x 25 mm by 3 layer
Supratherm special (E 7018) / chromotherm - 1 (E 8018) welding electrode 2.5 mm with material / manufacturer's test certificate
Supratherm special welding electrode 3.15 mm (E 7018) with material / manufacturer's test certificate
Cutting gas
Argon gas
T & Ps and consumables
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1520388)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_743881.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid