Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21 L
Closing Date
7 Nov 2023, 4:30 pmClosed
BDO
BDO
Madurai District Construction of Community Hall at Jariusilampatti village in Chittulotti Panchayat T. Kallupati Block
2023_RDTN_385925_1
01/TKP/APKM/2023-24
Open Tender
Civil Works
Works
90 days
T.kallupatti
Class III
2 documents required · 2 mandatory
₹0
Exempted
11 Nov 2023
4 Nov 2023
7 Nov 2023
4 Nov 2023
7 Nov 2023
4 Nov 2023
Amount
Madurai District Construction of Community Hall at Jariusilampatti village in Chittulotti Panchayat in T.Kallupatti Block
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Filling with M.Sand including cost and conveyance of all materials to site for foundation and flooring.
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Below Basment
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Above Basment
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for FF
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for Below Basment
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for FF
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supply and Fixing of New Steel Door in all charges etc,.
Cost and Supply of New Steel Window 1 of Size (1.20 x 1.30 )
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KANDASAMY V
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .